Similar Projects
Nemaha County Courthouse Foundation Restoration - Drainage
Infrastructure
Bidding
Auburn, NE 68305

Aquatic Habitat Sediment Basin Maintenance
Infrastructure
Bidding
Lincoln, NE

Richard Plautz Crane Viewing Site Trail Improvements
Infrastructure
Post-Bid
$320,000 est. value
Grand Island, NE

Elk Creek Channel Stabilization
Infrastructure
Post-Bid
Omaha, NE

Gilmore-Sarpy Avenue Green Infrastructure 2021
Infrastructure
Results
Omaha, NE 68107

NP Dodge Park Marina - Marina Wall Repair 2021
Infrastructure
Results
Omaha, NE 68112

51st and Madison Streets Creek Stabilization
Infrastructure
Bidding
Omaha, NE 68139

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Post-Bid

Culvert Maintenance 2021 - Phase II
Infrastructure
Results
Lincoln, NE

N-41, Adams - Sterling
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

117th Street and State Street Improvements (Grading, Paving and Erosion Control)
Infrastructure
Results
Omaha, NE 68112

Arch 2019 D3 Districtwide ER Event
Infrastructure
Bidding
Less than $5,000,000 est. value

Retaining Wall Replacement at 19th Street North of Pierce Street
Infrastructure
Results
NE

N-92, N-11, West
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Channel Stabilization of County Bridges H-001 and W-014
Infrastructure
Results
Lincoln, NE

Last Updated 10/27/2021 06:27 AM
Project Title

N-97, Tryon North

Physical Address View project details and contacts
City, State (County) (Hooker, McPherson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Group 1 Grading 0001 0030.10 Mobilization 1.000 Lump 0002 1009.00 General Clearing and Grubbing 1.000 Lump 0003 1011.00 Water 144.000 Mgal 0004 1012.00 Right-of-way Markers 70.000 Each 0005 1021.10 Remove Delineator Units 30.000 Each 0006 1030.00 Earthwork Measured in Embankment 19136.000 Cy 0007 1041.00 Salvaging and Placing Topsoil 180223.000 Sy 0008 1101.00 Remove Pavement 6011.000 Sy 0009 1101.25 Sawing Pavement 229.000 Lf 0010 1102.00 Remove Asphalt Surface 1900.000 Sy Group 4 Culvert 0011 0030.40 Mobilization 1.000 Lump 0012 4050.01 Excavation for Pipe, Pipe-arch Culverts, and Headwalls 2.000 Cy 0013 4107.07 Class 47b-3000 Concrete for Concrete Collars 0.530 Cy 0014 4157.00 Reinforcing Steel for Collars 43.000 Lb 0015 4360.24 24" Metal Flared-end Section 1.000 Each Group 5 Seeding 0016 0030.50 Mobilization 1.000 Lump 0017 1040.00 Slope Protection 180223.000 Sy 0018 1040.06 Slope Protection Mulch 180.000 Ton 0019 1111.05 Remove Silt Fence 3600.000 Lf 0020 L001.10 Soil Amendment 38.000 Ton 0021 L006.00 Cover Crop Seeding 37.000 Acre 0022 L019.15 Erosion Control, Class 1f 3663.000 Sy 0023 L022.11 Fabric Silt Fence-low Porosity 4502.000 Lf 0024 L022.73 Silt Fence Cleanout 4500.000 Lf 0025 L022.81 Silt Check, Type 1-high 9415.000 Lf Group 8b Electrical 0026 0030.80 Mobilization 1.000 Lump 0027 A070.10 1 1/2-inch Conduit in Trench 287.000 Lf 0028 A072.10 1 1/2-inch Conduit Under Roadway 35.000 Lf 0029 A074.12 1 1/2-inch Conduit, Jacked 28.000 Lf 0030 A080.22 Street Lighting Cable, No. 6 Bare 350.000 Lf 0031 A080.24 Street Lighting Cable, No. 6 Use 700.000 Lf 0032 A630.20 Remove Pull Box 2.000 Each 0033 A679.82 Remove Street Lighting Unit 2.000 Each 0034 A700.20 Relocate Street Lighting Unit 3.000 Each 0035 A705.20 Relocate Lighting Control Center, Type D 1.000 Each Group 9 Bituminous 0036 0002.55 Overlay Broken Lines 2075.000 Sta 0037 0002.60 Overlay Solid Lines 4150.000 Sta 0038 0030.90 Mobilization 1.000 Lump 0039 1020.03 Delineator, Type Iii 17.000 Each 0040 2001.00 Gravel Surface Course 49.000 Cy 0041 2009.10 Gravel Embedment 1.650 Sta 0042 2010.00 Crushed Rock Surface Course 139.000 Cy 0043 2021.00 Mailbox Post 11.000 Each 0044 4004.50 Cast Iron Grate and Frame 16422.000 Lb 0045 4024.55 Flume Spillway 212.000 Lf 0046 4024.70 Concrete Flume, Type I 19.000 Each 0047 4024.71 Concrete Flume, Type Ii 12.000 Each 0048 4105.59 Class 47b-3000 Concrete for Inlet and Junction Box 154.800 Cy 0049 4155.50 Reinforcing Steel for Inlet and Junction Box 14245.000 Lb 0050 8022.20 Hydrated Lime/warm Mix Asphalt 41130.000 Each 0051 8111.00 Shoulder Subgrade Preparation 336.300 Sta 0052 9002.12 Asphaltic Concrete for State Maintenance Patching, Typesps300.000 Ton 0053 9005.23 Asphaltic Concrete, Type Sps 5660.000 Ton 0054 9005.71 Asphaltic Concrete, Type Slx 40830.000 Ton 0055 9009.00 Placement of Asphaltic Concrete for Driveways Andintersections3645.000 Sy 0056 9009.75 Temporary Surfacing 9" 2552.000 Sy 0057 9010.49 Asphaltic Concrete for Patching, Type Slx 300.000 Ton 0058 9020.88 Performance Graded Binder (58s-34) for State Maintenancepatching16.200 Ton 0059 9021.17 Performance Graded Binder (58h-34) 2385.540 Ton 0060 9021.18 Performance Graded Binder (58s-34) 305.640 Ton 0061 9030.00 Constructing Asphaltic Concrete Curb 31987.000 Lf 0062 9034.00 Preparation of Intersections and Driveways 2007.000 Sy 0063 9053.00 Tack Coat 39500.000 Gal 0064 9111.00 Water 429.000 Mgal 0065 9170.00 Earth Shoulder Construction 1046.580 Sta 0066 9173.00 Subgrade Preparation 9.940 Sta 0067 9173.16 Trenched Widening, 1' 1026.700 Sta 0068 9179.20 Cold Milling, Class 1 681.680 Sta 0069 9300.37 Rap Incentive Payment for State Maintenance Patching 510.000 Each 0070 9300.38 Rap Incentive Payment 79543.000 Each 0071 9300.52 Asphalt Pavement Smoothness Testing I/d 1.000 Lump 0072 9300.53 Superpave Quality and Asphalt Smoothness I/d Payment 102075.000 Each 0073 P402.15 15" Culvert Pipe, Type 3,4,5 or 6 2015.000 Lf Group 10 General Items 0074 0001.08 Barricade, Type Ii 10500.000 Bday 0075 0001.10 Barricade, Type Iii 1250.000 Bday 0076 0001.75 Temporary Sign Day 2500.000 Each 0077 0001.90 Sign Day 12250.000 Each 0078 0003.10 Flagging 280.000 Day 0079 0003.20 Furnishing and Operating Pilot Vehicle 75.000 Day 0080 0005.10 Traffic Control Management 204.000 Day 0081 0010.04 Field Office 1.000 Each 0082 0020.00 Training 100.000 Hour 0083 0030.00 Mobilization 1.000 Lump 0084 1017.70 Construction Staking 1.000 Lump 0085 9110.01 Rental of Loader, Fully Operated 40.000 Hour 0086 9110.02 Rental of Motor Grader, Fully Operated 15.000 Hour 0087 9110.03 Rental of Dump Truck, Fully Operated 40.000 Hour 0088 9110.07 Rental of Skid Loader, Fully Operated 40.000 Hour 0089 9110.27 Rental of Crawler Mounted Hydraulic Excavator, Fullyoperated25.000 Hour 0090 L022.75 Temporary Silt Check 1000.000 Lf 0091 L032.70 Temporary Mulch 5.000 Ton 0092 L070.15 Mowing 225.000 Acre 0093 L860.50 Environmental Commitments - Contractor Compliance 1.000 Lump 0094 L860.51 Environmental Incentive 1.000 Each 0095 L860.52 Environmental Disincentive 1.000 Cday

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents