Similar Projects
Groundwater Well Drilling Services
Infrastructure
Bidding
West Olive, MI

Garfield Sanitary Pump Station
Infrastructure
Bidding
$2,000,000 est. value
Novi, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Supply and Delivery of Parts for Gorman Rupp Pumps
Results
Camden, MI

Second Well at Well 3
Infrastructure
Bidding
$1,000,000 est. value
Otisville, MI

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

Plugging, Drilling, Re-drilling and Site Restoration of Oil and Gas Wells
Results
Lansing, MI

8 Mile Vertical Dry Installed Submersible Non-Clog Pumps
Infrastructure
Bidding
Waterford Township, MI

William Stone #1 Orphan Well Project
Renovation
Post-Bid
Lansing, MI

Sewage Pump Outs
Term Contract
Results
Rochester, Rochester Hills, MI 48307

Wet Well Vactoring
Infrastructure
Post-Bid
Brighton, MI

Vault Pumping and Disposal Services for Hartwick Pines State Park
Results
Grayling, MI 49738

Leachate Pump and Sump Drainer
Infrastructure
Post-Bid
Livonia, MI

Last Updated 07/21/2022 07:51 AM
Project Title

Cell 7 Phase 4 Construction - Land Preserve

Physical Address View project details and contacts
City, State (County) Riverview, MI   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Cell 7 Phase 4 Construction at the Riverview Land Preserve Project will continue base grade and liner installation for Cell 7, which will complete the lower liner area and tie into existing cell liner, and install leachate sumps with pumps and controls.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents