Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Mixed Use Project
New Construction
Conception
Salt Lake City, UT 84102

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

South Cairns Development
New Construction
Design
Sandy, UT 84070

Research Administration Building (RAB) Elevator Remodel
Renovation
Bidding
$358,983 est. value
Salt Lake City, UT 84120

WGU Talon Space Remodel
Renovation - 3,778 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Salt Lake City, UT 84107

Craig Swapp Office Building
New Construction - 24,282 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
South Jordan, UT 84095

Health Sciences Campus Office Building
Post-Bid
Less than $78,439,728 est. value
Salt Lake City, UT

CMGC Building 525 1st Floor East Side Radiology Backfill
Demolition
Post-Bid
$2,290,478 est. value
Salt Lake City, UT 84112

Construction Management / General Contractor - BPRB Level 1 Lab Remodel
Renovation - 14,000 SF
Results
Less than $4,933,402 est. value
Salt Lake City, UT

Fieldhouse Seismic Upgrade
Term Contract
Results
Less than $2,409,976 est. value
Salt Lake City, UT

Erin Hills Estates
New Construction
Construction
West Valley City, UT 84128

Jordan Credit Union
New Construction - 30,674 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
South Jordan, UT 84095

800 South & State
New Construction
Pending Verification
Salt Lake City, UT

Butterfield Property
New Construction
Pending Verification
Herriman, UT

Last Updated 01/27/2022 09:58 AM
Project Title

SLCC STC Veterans Services Office Suite Remodel

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84123   (Salt Lake County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $232,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of remodeling of the existing Veterans Services Area at Salt Lake Community College. Work required under the construction includes demolition of existing spaces, new metal stud wall framing, gypsum board, carpet, hollow metal door frames and wood doors, casework, painting, new ceiling systems, lighting, electrical, fire alarms, fire sprinklers, mechanical and plumbing along with other items as identified on the construction documents.

Details

Office, Renovation, College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents