Similar Projects
Last Updated | 03/06/2023 08:35 AM |
Project Title | Army Reserve Center in Asheville, North Carolina |
Physical Address | View project details and contacts |
City, State (County) | Asheville, NC 28801 (Buncombe County) |
Category(s) | Commercial, Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Site Development, Warehouse/Storage |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information. DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) W912QR22R0041 for the construction of the Army Reserve Center and associated secondary facilities, located in Asheville, North Carolina. Description of the construction project is as follows: The construction of the Army Reserve Center is to be constructed of insulated concrete forms with a masonry veneer and reinforced concrete foundation and floors; resulting in a total building area of 31,637 SF. The construction of the Vehicle Maintenance Shop is to be constructed of insulated concrete forms with a masonry veneer and reinforced concrete foundation and floors; resulting in a total building area of 9,781 SF. The Unheated Storage Building is designed as a pre-engineered metal building; resulting in a total building area of 1,500SF. In addition to these buildings, there is a covered pre-engineered metal wash rack and a bi-level loading ramp. The project delivery method will be Design-Bid-Build (DBB). The facility will need to be compatible with applicable DoD and Army standards. The Army Reserve Center is designed as a "four pod" shape, single story facility that provides sufficient administrative areas, educational spaces, storage spaces, assembly area, building operations areas and support spaces such as break room, lactation room and restrooms with lockers. The Vehicle Maintenance shop is designed as a rectilinear shape with the work bay occupying one half of the area and the support elements occupying the other half. The Unheated Storage Building is a pre-engineered metal building which will provide sufficient space to contain an item that can be stored in an unconditioned environment. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems and landscaping. Construction of an Army Reserve Center in Asheville, North Carolina. The Estimated Construction Cost is betw een $10,000,000.00 and $25,000,000.00. NAICS Code is 236220. Size Determination is $39.5M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM, the business w ill be considered other than a small business. This project is set-aside 100% for Small Business. Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at w w w .sam.gov. Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM. OFFEROR'S QUESTIONS AND COMMENTS Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation. To submit and review bid inquiry items, bidders will need to be a current registered user or selfregister into system. The Solicitation Number is: W912QR22R0041 The Bidder Inquiry Key is: 4DRBCA-XWZXZZ5 The Contract Duration is estimated at eight hundred and eighty eight (888) calendar days from Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details | 31,637 SF - 31,637 SF. 9,781 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |