Similar Projects
Pmi Paving: Route 9 - Route 9D to Rt 113 (Spackenkill Rd) Dutchess County
Infrastructure
Design
$9,000,000 est. value
Hyde Park, NY

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Sewer Main Lining
Infrastructure
Bidding
$300,000 est. value
Millbrook, NY

Road Resurfacing for Hopewell North Water District
Post-Bid
Hopewell Junction, NY

John Jay Sewer Extension on Auditorium Drive
Post-Bid
Hopewell Junction, NY 12533

Hot Mix Asphalt (HMA) Concrete In-Place
Term Contract
Results
Poughkeepsie, NY 12603

Pavement Resurfacing Project
Results
$9,900,000 est. value
East Fishkill, Lagrange, NY

Innis Avenue Sewer Rehabilitation
Infrastructure
Post-Bid
Poughkeepsie, NY 12601

Maintenance of Route 9 and Route 55 Medians
Term Contract
Results
Poughkeepsie, NY

Empire Line (Poughkeepsie,NY To Scotia, NY) - Paving Services
Alteration
Post-Bid

Special Surface Treatment and Sidewalks
Results
$1,100,000 est. value
East Fishkill, Lagrange, Poughkeepsie, NY

Driveway Paving
Infrastructure
Post-Bid
Millbrook, Salt Point, Verbank, NY 12578

Greenfields Collection System - Trenchless Pipe Rehabilitation
Results
Poughkeepsie, NY

Road Paving and Bituminous Concrete
Alteration
Post-Bid
Beacon, NY

2021 Paving Project
Results
Red Hook, NY 12571

Last Updated 07/15/2022 05:11 AM
Project Title

Fishkill Avenue and Hanna Lane Sewer Replacement

Physical Address View project details and contacts
City, State (County) Beacon, NY 12508   (Dutchess County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the installation of 1,176 linear feet of 12" SDR-35 PVC sewer pipe, 100 linear feet of C900 (DR-25) pipe, installation of 7 sewer manholes, installation of 1 doghouse manhole, abandonment and removal of existing sewer and sewer structures, milling operations, paving operations, and restoration of all areas outside of paved areas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents