Similar Projects
Last Updated | 05/24/2023 05:13 PM |
Project Title | Truckee Meadows Water Reclamation Facility Heat Loop Improvements - City of Sparks |
Physical Address | View project details and contacts |
City, State (County) | Sparks, NV 89431 (Washoe County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2026 |
Bids Due | View project details and contacts |
Estimated Value | $1,411,650 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 24, 2023, multiple projects were approved by the city and an engineer firm has been selected. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. Truckee Meadows Water Reclamation Facility Heat Loop Improvements. A detailed scope has not yet been determined. TMWRF solely relies on its internal heat loop system that uses gas generated from the waste digestion system to heat and deliver hot water to hydronic equipment, which is then used to heat its buildings and wastewater treatment processes. Much of the heat loop infrastructure is 30-50 years old and has experienced recent failures, likely approaching the end of its service life. This project includes review and verification of the plant's heating demands and loads; suggesting required improvements; and design services- preliminary in construction cost estimates and assistance during bidding for the first phase of repair and rehabilitation of the heat loop system. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |