Similar Projects
Last Updated | 05/08/2023 04:33 PM |
Project Title | Water Main Interconnection Project |
Physical Address | View project details and contacts |
City, State (County) | Ridgefield, CT 06877 (Fairfield County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Department of Health has authorized Aquarion Water Company to public bid the Craigmoor Water Main Interconnection Project under the Drinking Water State Revolving Fund (DWSRF) contained in Section 22a-482 of the Regulations of Connecticut State Agencies (RCSA) to improve existing water infrastructure. Description of Activity: T he project will include construction of approximately 6,100 LF of 8-inch water main and associated restoration to interconnect Aquarion's Craigmoor Water System to the Ridgefield Main System. Site Location: The project is located along Barlow Mountain Road, North Salem Rd, and Craigmoor Rd in Ridgefield Connecticut. Pre-bid meeting will be held on Monday, April 24, 2023 at 10:00 am at intersection of Barlow Mountain Road and North Street, Ridgefield. This project is subject to the federal Davis-Bacon Act and American Iron and Steel (AIS) compliance with respect to federal prevailing wages, labor, and AIS requirements, among other requirements. The Bidder shall hold a current DAS Contractor Prequalification Certificate in the State of Connecticut according to C.G.S. A 4a-100, C.G.S. A4b-101 and C.G.S.A4b-91. Bidders shall submit with their Bids their DAS Contractor Prequalification Certificate along with a current Update Bid Statement. Any Bid submitted without a copy of the DAS Prequalification Certificate and an Update Bid Statement shall be invalid. As to proposed Subcontractors whose subcontract value is equal to or greater than $500,000, the apparent low Bidder shall submit to the Owner, no later than fourteen (14) days after Bid opening, a current DAS Contractor Prequalification Certificate in an appropriate work classification along with an Update Bid Statement for each such Subcontractor. Bidders do not need to include Subcontractor Prequalification Certificates and Update Bid Statements with their Bids. The Successful Bidder and each of its Subcontractors having subcontracts in value equal to or greater than $500,000 shall maintain and keep current their respective DAS Contractor Prequalification Certificates at all times during the term of the Contract and any warranty period set forth in the Contract Documents. Project bid documents including plans, specifications, bid forms, and access to Aquarion's Procureware website are available at www.aquarionwater.com/srfbids. Questions and requests for clarification may be made on Aquarion's Procureware website. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |