Similar Projects
Asphalt Paving - Student Activity Center (SAC)
Infrastructure
Bidding
$450,000 est. value
Eau Claire, MI 49111

Hot Mix Asphalt Cold Milling and Resurfacing, Pavement Markings on Red Arrow Highway
Infrastructure
Bidding
$1,686,000 est. value
Sawyer, MI 49125

Paving & Site Lighting
Post-Bid

2021 Michigan Street Reconstruction Project
Infrastructure
Post-Bid
Three Oaks, MI 49128

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Elm Street Improvements
Results
Watervliet, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Main Street Alleys Reconstruction
Results
Less than $160,000 est. value
Berrien Springs, MI

Shorewood Hills HOA - Pavement Improvements
Renovation
Post-Bid
Sawyer, MI 49125

Site And Parking Lot Improvement Project
Results
Three Oaks, MI

Four Winds Hartford Employee Lot Rebuild and Back Loop Road Repair Project
Renovation, Alteration - 24,000 SF
Post-Bid
$310,000 est. value
New Buffalo, MI 49117

6.57 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Joint Repairs
Results
MI

Wall Street Parking Lot Addition
New Construction
Post-Bid
Benton Harbor, MI

Cold Patch Pavement
Results
Saint Joseph, MI

Cornerstone Alliance: Harbor Shores Trail Improvements
Renovation
Post-Bid
Benton Harbor, MI 49022

Last Updated 06/15/2022 02:41 AM
Project Title

Hot Mix Asphalt Spot Rehabilitation on the Shoulder and Lane

Physical Address View project details and contacts
City, State (County) Stevensville, MI 49127   (Berrien County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,804,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

8.83 mi of hot mix asphalt spot rehabilitation on the shoulder and lane as needed, construction of multiple hot mix asphalt crossovers and widening, concrete curb and gutter, culverts, sewer, drainage, guardrail, bridge rehabilitation to include 54 inch prestressed concrete I-beams, steel sheet piling and pavement markings on I-94 eastbound over Pipestone Road and along I-94 from west of Puetz Road east to west of Britain Avenue, Berrien County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents