Similar Projects
Last Updated | 02/12/2022 09:45 AM |
Project Title | Repair of Bridges on U.S. 27 (S.R. 29) |
Physical Address | View project details and contacts |
City, State (County) | TN (Scott County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The repair of bridges on U.S. 27 (S.R. 29) over Webb Creek (L.M. 1.63) and New River (L.M. 8.91) 303-10.01 Mineral Aggregate (Size 57) 1,020.000 Ton 307-01.08 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading b-m2 110.000 Ton 411-01.10 Acs Mix(Pg64-22) Grading d 199.000 Ton 411-12.03 Scoring For Rumble Stripe (Noncontinuous) (8in Width) 0.100 l.m. 415-01.02 Cold Planing Bituminous Pavement 3,151.000 s.y. 604-03.04 Pavement @ Bridge Ends 124.000 s.y. 604-04.02 Applied Texture Finish (Existing Structures) 2,777.000 s.y. 604-10.05 Concrete 16.000 s.f. 604-10.14 Remove Existing Wearing Surface (1) Ls 604-10.30 Bridge Deck Repairs (Full Depth Of Slab) 18.000 s.y. 604-10.34 Concrete Overlayed Bridge Deck Repair (Full Depth) 3.000 s.y. 604-10.42 Concrete Repairs 55.000 c.f. 604-10.50 Bridge Deck Repairs (Partial Depth Of Slab) 189.000 s.y. 604-10.54 Concrete Repairs 15.000 s.f. 604-10.55 Concrete (Foundation Repairs) 1.000 c.y. 604-10.56 Concrete Overlayed Bridge Deck Repair (Partial Depth) 10.000 s.y. 604-10.58 Epoxy Injection (Injection) 18.000 Gal. 604-10.62 Epoxy Injection Repair (Complete And In Place) 1,520.000 l.f. 604-10.63 Concrete Repairs (Cracks) 17.000 l.f. 606-24.13 Temporary Sheet Piles (1) Ls 617-04.01 Type 1 Thin Epoxy Overlay (Epoxy-Urethane) 2,359.000 s.y. 620-09 Removal & Replacement Of Existing Bridge Rail 42.000 l.f. 705-02.02 Single Guardrail (Type 2) 125.000 l.f. 705-02.10 Guardrail Transition 27in To 31in 2.000 Each 705-04.50 Portable Barrier Rail Delineator 45.000 Each 705-06.20 Tangent Energy Absorbing Term Mash Tl-3 6.000 Each 705-06.26 Thrie Beam Bridge Transition Mash Tl-2 8.000 Each 709-05.06 Machined Rip-Rap (Class a-1) 182.000 Ton 712-01 Traffic Control (1) Ls 712-02.02 Interconnected Portable Barrier Rail 1,450.000 l.f. 712-02.60 Temporary Work Zone Crash Cushion (Mash Tl-3) 4.000 Each 712-04.01 Flexible Drums (Channelizing) 73.000 Each 712-06 Signs (Construction) 521.000 s.f. 712-07.03 Temporary Barricades (Type Iii) 35.000 l.f. 712-09.01 Removable Pavement Marking Line 19,110.000 l.f. 712-09.02 Removable Pavement Marking (8" Barrier Line) 5,788.000 l.f. 712-09.04 Removable Pavement Marking (Stop Line) 97.000 l.f. 713-02.15 Flexible Delineator (Yellow) 56.000 Each 713-02.27 Concrete Barrier/Parapet Delineator (Bidirectional) 45.000 Each 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 0.900 l.m. 717-01 Mobilization (1) Ls 740-07.04 Geogrid Reinforcement Type 2 2,412.000 s.y. 740-10.04 Geotextile (Type Iv)(Stabilization) 681.000 s.y. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |