Similar Projects
Academy of Music Basement Renovations
Renovation
Design
Less than $325,000 est. value
Amherst, Northampton, MA 01060

Update Bathroom to Meet ADA Compliance
Post-Bid
Less than $20,000 est. value
Wrentham, MA 02093

Shawme Crowell Comfort Stations Renovations - Filed Sub Bids
Post-Bid
$1,500,000 est. value
Sandwich, MA

Z--Caco Marconi Beach Restroom Interior Rehab
Results
$100,000 to $250,000 est. value
Wellfleet, MA 02667

Construction Manager (CM) at Risk Services for Forest River Pool and Bathhouse
Results
Less than $10,200,000 est. value
Salem, MA

New Heights Charter School Of Brockton
Addition - 20,000 SF
Construction
$736,298 est. value
Brockton, MA 02301

Wychmere Beach Club
New Construction
Construction
Harwich, MA

Shawme Crowell Comfort Stations Renovations
Renovation
Post-Bid
$1,800,000 est. value
Sandwich, MA

Z--Caco - Rehab of Coast Guard Beach Restroom
Renovation
Results
$250,000 to $500,000 est. value
Eastham, MA

Tub Room Renovation - 316 School Street
Renovation
Post-Bid
$35,000 est. value
Acton, MA 01720

Z--CACO-Renovations to Satellite Restroom at Salt Pond Visitor Center
Renovation
Results
$250,000 to $500,000 est. value
Eastham, MA

Gerow Recreation Area Restroom Building - General Bids
Renovation
Post-Bid
$300,000 est. value
Concord, MA 01742

Z--CACO-Race Point Beach Restroom Interior Rehab
Renovation
Results
$100,000 to $250,000 est. value
Provincetown, MA

Farley Building Bathroom Renovation Project
Renovation
Post-Bid
Framingham, MA

Bathroom Renovations, Golden Heights II
Renovation
Results
Less than $50,000 est. value
Webster, MA 01570

Last Updated 12/06/2021 10:02 AM
Project Title

Sunderland Riverside Park Building Improvements

Physical Address View project details and contacts
City, State (County) Sunderland, MA 01375   (Franklin County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $191,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is an 18’ x 19’ storage structure with an projecting roof that covers a picnic and kayak storage/seating area for an overall roof area of 21’ x 40’. Projecting framing over the seating area is supported by an LVL beam and wood column assembly. Base frames for the future installation of custom kayak storage/seating area furniture will be installed. The ground surfacing defined by landscape edging will be ADA-compliant engineered wood carpet. The storage structure is a reinforced slab on conventional footings with a partially sloped floor for mower storage. Framing throughout will be primarily 2x Douglas Fir. Openings will consist of a garage door, a man door, and a sliding barn door, in addition to screened ventilation openings integrated into east wall framing. Add Alt 1: Kayak storage/seating benches Add Alt 2: Slatted screens mounted on kayak storage units Add Alt 3: Table with floor panel units Add Alt 4: Soccer Shed Slab The Soccer Shed Alt project is a 13’ x 18’ reinforced 6” slab with a thickened edge. NOTE: The plans in Exhibit 2 show the entire structure. The intent of this solicitation is to engage the Contractor to construct the Foundation Only

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents