Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Holloway Road Improvements
Results
Ballwin, MO 63011

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

Last Updated 09/12/2022 10:05 AM
Project Title

Bayless Avenue Resurfacing

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63125   (Saint Louis County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,298,184 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 12, 2022, project was awarded to N.B. West, awarded amount is $2,298,183.81. St. Louis County Project No. AR-1693, Federal Project No. STP-4900(635) consists of the removal and replacement of deteriorated and/or damaged pavement, pavement surfacing and texturing, superpave asphaltic concrete overlay, removal and replacement of sidewalk curb ramps, reconstruction of an existing parking lot, removal and replacement of traffic signal equipment, installation of traffic signal interconnect, and other incidental items on Bayless Avenue from Union Road to Lemay Ferry Road within St. Louis County. The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (DavisBacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of Transportation's approved contractor listing, seven (7) days prior to bid opening. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All questions must be submitted by 5:00 p.m. on July 6, 2022 via e-mail to the Project Manager (Daniel Fauke, P.E., (DFauke@stlouiscountymo.gov). Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to "Treasurer, St. Louis County." The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 12%. No 2nd tier subcontracting will be allowed on this project.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents