Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Hotel Road Rehabilitation Project
Post-Bid
Cleveland, OH

Sidewalk Block Replacement Program for 2021-2022
Post-Bid
Euclid, OH

Design Services - Chagrin Boulevard Resurfacing Project
Results
Less than $2,659,996 est. value
Shaker Heights, OH 44118

Intersection - CUY-US 322-15.59 Safety
Results
Gates Mills, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Four Lane Resurfacing - CUY/Lak-IR 271-13.61/00.00
Results
Highland Heights, Mayfield, Willoughby Hills, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Capital Maintenance Repair of City Facilities Masonry
Results
Less than $35,568 est. value
Cleveland, OH

Redevelopment of 3568 Lee Road
Infrastructure
Post-Bid
Shaker Heights, OH 44120

Shannon Road Resurfacing and Waterline Replacement
Results
Cleveland Heights, OH 44118

Four Lane Resurfacing-SR 14-06.09
Results
Garfield Heights, OH 44105

Four Lane Resurfacing-Ir 480-22.45
Results
Bedford Heights, Cleveland, Maple Heights, Warrensville Heights, OH

Construction Management Services - Lake Road US-6 to Lake Road US-6A Ramp Resurfacing
Results
$32,965 est. value
Rocky River, OH 44116

2021 Street Resurfacing
Results
$1,531,129 est. value
Shaker Heights, OH 44120

Reported 07/08/2022 11:20 AM
Project Title

Lorain Avenue Bikeway Project - Ohio Department of Transportation

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44131   (Cuyahoga County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Cleveland, Ohio. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. Construction of a multi-modal route on Lorain Avenue between West 20th to West 65th. As of July 7, 2022, further details regarding design completion and firm construction timelines has not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents