Similar Projects
National Forest System Road (NFSR) 700 and 91 Road Surfacing
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Flagstaff, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

Road Construction IDIQ - Coconino & Kaibab National Forests
Results
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Slurry Seal FY21
Results
Page, AZ

Los Abrigados to Brewer Road Connection Project
Infrastructure
Post-Bid
$150,000 est. value
Sedona, AZ 86336

CMAR - Design and Construction Services for Beulah/University Roadway Project
Infrastructure
Results
$11,700,000 to $11,800,000 est. value
Flagstaff, AZ

Page Municipal Airport - Segmented Circle Relocation
Infrastructure
Post-Bid
Page, AZ 86040

Last Updated 07/18/2022 03:09 AM
Project Title

Mather Point Campground Loops

Physical Address View project details and contacts
City, State (County) Grand Canyon Village, AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 100%. The AZ NP GRCA 272(1), Mather Point Campground Loops project is located in Grand Canyon Village approximately 22 miles west of the Grand Canyon East Entrance in Coconino County, AZ. The project is proposing to rehabilitate (3R) campground roads and campsite parking stalls at the Mather Point Campground within the South Rim of the Grand Canyon National Park. The project is proposing to rehabilitate (3R) approximately 2.37 miles of campground roads along with several campsite parking stalls. The roads and parking stalls need rehabilitation due to deterioration that is typical of aging pavements. The existing pavement within the Mather Point Campground is paved and in poor condition with roadway cracking and aggregate surfacing. Schedule A work for this project includes Juniper Loops 1 & 2, Maple Loop, and Oak Loops 1 & 2, for an approximate length of 1.51 miles. Option Y includes Pine Loop for an approximate length of 0.47 miles. Option Z includes Sage Loops 1, 2, 3, & 4 for an approximate length of 0.39 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents