Similar Projects
Power Line Components
Term Contract
Sub-Bidding
Springfield, IL 62703

Inspections, Testing, Maintenance And 24-hour Monitoring Of Security And Fire Systems
Term Contract
Sub-Bidding
Chatham, IL 62629

Public Works Tree Planting
Term Contract, Alteration
Post-Bid
Springfield, IL

Elevator Maintenance Services
Term Contract
Post-Bid
Springfield, IL 62703

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Klein And Mason Warehouse HVAC Renovations
Renovation, Infrastructure
Results
Springfield, IL 62702

Development Partner
New Construction, Infrastructure
Post-Bid
Springfield, IL 62702

Iron Fittings
Term Contract, Alteration
Post-Bid
Springfield, IL

Water Main Gate and Valves
Alteration
Post-Bid
Springfield, IL

Water Meters
Alteration
Post-Bid
Springfield, IL

Fire Hydrants
Alteration
Post-Bid
Springfield, IL

Residential Water Service Materials
Alteration
Post-Bid
Springfield, IL

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

FY2023 Ready-Mix Concrete
Term Contract, Alteration
Post-Bid
Springfield, IL

Job Order Contracting
Term Contract
Post-Bid

Last Updated 05/02/2023 03:39 PM
Project Title

Distribution Transformers

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PRICE GUARANTEE Price(s) shall be honored by the bidder for no less than 30 days after the bid opening date. Please furnish prices with freight included, FOB destination, and shipping date(s) for the following. Indicate manufacturer and part number of items quoted. COST EVALUATION: Because of the challenges faced in material procurement, SUB is implementing an evaluation process that adds 1/2 % per week, based on the average number of weeks to delivery. The evaluated cost will be [Price offered on the bid] * (1 + [Average delivery, in weeks]*0.005) = Evaluated cost. The intent of this method is to encourage an earlier delivery. The evaluated cost IS NOT the same as the permissible escalation. STORAGE, HANDLING AND DELIVERY Title of ownership shall transfer to Springfield Utility Board (SUB) upon delivery and acceptance at this location; SUB does not have a loading dock at this yard; Shipping instructions per Standard Transformers shall NOT be washed prior to delivery; Notification of delivery shall be made two (2) working days prior by calling 541-915-3683, if no answer, call 541-726-2395; and Inspection of goods will be made at delivery point. Goods must conform to SUB's specifications and are subject to final inspection and acceptance, if not; material will be rejected and held at Vendor's risk. Damage in shipment of FOB Destination orders are Vendor's responsibility to prove conformity prior to acceptance.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents