Similar Projects
Lakeview Neighborhood Improvements - 22320 - City of Miami Beach
Alteration
Conception
$41,000,000 est. value
Miami Beach, FL

Wastewater Pump Station Improvements
Design
North Bay Village, FL

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Racetrack Water Tower Booster Pump Station
New Construction
Results
$750,000 est. value
Homestead, FL 33035

72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street
Results
Less than $8,142,405 est. value
Hialeah, FL 33010

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Farmasi Cosmetics Office and Distribution Facility
New Construction, Infrastructure - 80,000 SF
Construction
$9,000,000 CJ est. value
Doral, FL 33172

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

100 Miracle Mile
New Construction, Infrastructure, Renovation - 37,000 SF
Pending Verification
$40,000,000 CJ est. value
Coral Gables, FL 33134

Eleven44
New Construction, Infrastructure - 16,607 SF
Design
$3,600,000 CJ est. value
Miami Beach, FL 33141

Water Service Conversion from Rear Water Services to Front Water Services
Infrastructure
Post-Bid
$8,643,471 est. value
Miami, FL

CDBG Drainage Improvements and Water Main Installation
Results
$1,971,586 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Last Updated 10/28/2022 11:07 AM
Project Title

North Bay Island Stormwater Pump Station - Construction - SW23-03 - North Bay Village

Physical Address View project details and contacts
City, State (County) North Bay Village, FL 33141   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope cannot be determined. As of October 28, 2022, this project is included City of North Bay Village FY 2023 Adopted Budget. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents