Similar Projects
Mass DOT Steel Beam Guardrail
Infrastructure
Bidding
MA

D Branch Platform Accessibility
Infrastructure
Bidding
$9,000,000 est. value
Boston, MA

BTD Flexposts
Term Contract
Post-Bid
Boston, MA

Automated Traffic Signal Performance Measures
Post-Bid
Boston, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Scheduled and Emergency Impact Attenuator Repairs and Related Work at Various Locations
Results
Less than $100,549 est. value

89 Brighton Avenue
Renovation - 124,300 SF
Construction
$47,000,000 est. value
Boston, Brighton, MA 02134

Construction Services - Drainage, Sidewalks and Roadways
New Construction
Construction
$2,268,000 est. value
Boston, MA

Wayfinding Red Line
Infrastructure
Bidding
$2,500,000 est. value
Boston, MA

TSE - Light Bases and Malleable Collars
Post-Bid
Boston, MA

Construction of an Emergency Access/Egress Driveway
Results
Less than $240,000 est. value
Dorchester, MA 02124

Intersection Signalization
Infrastructure
Bidding
$2,800,000 est. value
Boston, MA 02119

2020 Walkable Streets Program
Post-Bid
Boston, MA

Solar Rectangular Rapid Flash Beacon Installations
Results
Chelsea, MA

2020 Walkable Streets Program for Sidewalk Construction on Capen Street
Post-Bid
Boston, Dorchester, MA 02124

Reported 02/25/2022 12:00 AM
Project Title

South Coast Rail Offsite Traffic Improvements

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,500,000
Plans Available from State Agency - 01/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements in Middleborough including roadway improvements along Route 28 and Route 105, signalized intersection improvements at Route 28 pedestrian crossing, Route 28/Route 105, Route 105/I- 495 Northbound, Route 105/I-495 Southbound, and Route 105/Route 7, (2) improvements at the Route 140 and Home Depot Drive intersection in Taunton, installation of sidewalk along Route 140, and relocation of Industrial Drive to Route 140, (3) improvements at the President Avenue (Route 6) and North Main Street intersection in Fall River, (4) the installation of South Coast Rail (SCR) program-wide trailblazing signage in Middleborough, Taunton, Lakeville, Freetown, New Bedford, and Fall River; and (5) improvements at the Nash Road and Church Street intersection and 2,300 feet of sidewalk improvements along Church Street in New Bedford.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents