Similar Projects
Trail Mountain Emergency Watershed Protection Project
Post-Bid
Castle Dale, UT 84513

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Parowan Pipe Lining with Centripipe Applied Liner
Results
$230,000 to $250,000 est. value
Parowan, UT

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Last Updated 09/24/2020 05:56 PM
Project Title

Nuck Woodward Creek Watershed Restoration BDA Installation

Physical Address View project details and contacts
City, State (County) Huntington, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on Nuck Woodward Creek, a tributary to the Right Fork of Huntington Creek, in Emery County, Utah. We are seeking a small (4-6 person) chainsaw/labor crew to work alongside UDWR staff during a stream stabilization project. We will hire the crew on an hourly basis and can keep the crew employed until our budget of $25,000 is reached, or project ends. Bids must include the number of personnel in the crew and the total hourly cost of that crew. The crew will be working closely with DWR personnel that have scheduled September 21st to November 2nd for completion of this work; therefore, it is critical that the contractor crew is able to work within this timeframe.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents