Similar Projects
Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2020 Street Urbanization
Infrastructure
Post-Bid
$2,807,504 CJ est. value
Hilbert, WI 54129

Sequoia Drive Sewer, Water, and Grade and Gravel
Infrastructure
Results
Appleton, WI

2022 Water Main and Sanitary Sewer Reconstruction
Infrastructure
Results
$1,100,000 est. value
Menasha, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

Asphalt Bridge Approaches - Appleton, Sth 441
Infrastructure
Pending Verification
$7,000,000 CJ est. value
Hilbert, WI 54129

Bellin Health New Brillion Clinic
New Construction, Infrastructure - 15,990 SF
Post-Bid
$5,000,000 CJ est. value
Brillion, WI 54110

2022 Lead Service Line Replacement and Well No. 1 Modifications
Infrastructure
Results
$1,600,000 est. value
New Holstein, WI 53061

Brillion Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Brillion, WI 54110

Chilton New Stadium and Elementary School Addition and Renovations
Addition, Demolition, New Construction, Build-out, Infrastructure - 45,414 SF
Post-Bid
$4,000,000 CJ est. value
Chilton, WI 53014

2022 Prospect Street Utility and Street Improvements, A SDWLP
Infrastructure
Results
$360,000 est. value
New Holstein, WI 53061

Chilton Salt Storage Building Construction Only
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Chilton, WI 53014

A New Fire Station
New Construction, Infrastructure
Results
$2,703,878 CJ est. value
Chilton, WI 53014

Last Updated 03/16/2023 05:13 PM
Project Title

Marina Inlet Culvert Replacement - Wisconsin Department of Natural Resources

Physical Address View project details and contacts
City, State (County) Sherwood, WI 54169   (Calumet County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $318,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: NATURAL RESOURCES - HIGH CLIFF STATE PARK This project replaces the existing culvert, approximately 120' long and 12' diameter, connecting the outlet of Butterfly Pond to the marina. The culvert passes under the sole access road to the public boat launch and marina providing access to roughly 2/3 of the marina boat slips. Temporary vehicle access to the area needs to be constructed to maintain access to the boat launch and marina. Lower Cliff Road, was a through street but is now blocked off to motor vehicles, is the best option for temporary access to the area. After construction, the Lower Cliff Road obstruction should be reinstalled but altered to allow pedestrian and non-motorized vehicular access to the park.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents