Similar Projects
North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Aggregate Pier Ground Improvements
Infrastructure
Sub-Bidding
Federal Way, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

Doris Morrison Learning Center Building Site and Trail
New Construction, Infrastructure
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Post-Bid
$705,000 to $790,000 est. value
Eatonville, WA 98328

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Orchards Parcel Site Development
Alteration
Pending Verification
$1,000,000 est. value
Vancouver, WA 98682

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Bidding
Less than $300,000 est. value
Spokane, WA 99202

Reported 11/04/2021 12:00 AM
Project Title

VA American Lake Phase 2 Site Development

Physical Address View project details and contacts
City, State (County) Tacoma, WA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

8(a) Set-Aside for the VA American Lake Phase 2 Site Development project includes demolition and hazardous materials abatement of five (5) existing buildings, existing parking area and underground utilities. The work also includes but is not limited to construction grading, pavements, utilities, lighting, and landscaping for a 650-vehicle parking lot and 1000 feet of two lane roadway. Utilities will include drainage, sanitary sewer, watermain, electrical, telecommunication, steam and geothermal.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Demolition, Selective Demolition, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents