Similar Projects
Bituminous Paving
Infrastructure
Bidding
$700,000 est. value
Ashwaubenon, WI

Crackfilling
Post-Bid
De Pere, WI

Green Isle Park Paving
Post-Bid
$300,000 est. value
Allouez, WI 54301

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2021 Street and Utility Improvements Bohemia Drive, Hager Road, and Schleis Lane
Results
Denmark, WI 54208

Private Water Service Line Containing Lead Replacement
Term Contract
Post-Bid
Green Bay, WI

2021 Resurfacing
Results
Green Bay, WI

2021 Road Construction
Post-Bid
De Pere, WI

2020 North Overland Road Sanitary Sewer
Results
Hobart, WI

Local Road Improvement
Post-Bid
WI

V. Bellevue, Manitowoc Road, Allouez Avenue - Kewaunee Road
Results
WI

2021 Road Improvement
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

TIF 2 Riverside Drive
Results
Less than $500,000 est. value
Suamico, WI 54173

Last Updated 05/05/2022 11:44 PM
Project Title

Resurfacing 3-22 (Including Sewer and Water)

Physical Address View project details and contacts
City, State (County) Green Bay, WI   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes construction of approximately 3,480 linear feet of 6" and 8" water main including service relays, and water construction staking; installment of 95 linear feet of 8" sanitary sewer relay, including sanitary sewer lateral reconnections, and sanitary sewer manhole replacement; 2,302 linear feet of 12", 15", and 18" storm sewer construction including inlet leads, storm sewer laterals, storm sewer inlet construction, storm manhole removal, and storm manhole construction; 3,000 cubic yards of excavation, 3,800 linear feet of curb and gutter, 2,600 tons of crushed aggregate base course, 2,500 tons of breaker run, 8,600 tons of HMA pavement, 45,000 square yards of milling surface, 5,000 square feet of concrete sidewalk and driveway reconstruction; 280 square feet of cast iron curb ramp detectable warning field; construction staking, and 1,800 square yards of restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents