Similar Projects
Tyler Consolidated Middle/High School Phase II - HVAC Renovations
Alteration
Bidding
$240,000 est. value
Middlebourne, WV

Municipal Building HVAC Project
Alteration
Bidding
$50,000 est. value
Chester, WV 26034

HVAC Bi-Monthly Filter Replacement and Inspections
Post-Bid
Charleston, WV 25311

Replacement of Commercial Tumbler Dryers
Post-Bid
Barboursville, WV 25504

TA Lowery Elementary School HVAC Replacement
Results
Shenandoah Junction, WV 25442

HVAC Installation
Results
$158,460 est. value
Benwood, WV 26031

HVAC Upgrades to West Virginia State Office Building Nos. 5, 6, and 7
Alteration
Bidding
$50,000 est. value
Charleston, WV

Charleston-Kanawha Housing Switzer Center HVAC Replacement
Post-Bid
Charleston, WV 25387

Range Hood Cleaning and Inspection
Results
Charleston, WV

New Heating and Cooling System
New Construction, Alteration
Bidding
Marmet, WV

Preston County High School HVAC Upgrades
Post-Bid
Kingwood, WV 26537

Luau Manor Apartments Heating Boilers and Domestic Hot Water Heaters Replacement
Results
Wheeling, WV 26003

Request for Quotations #51000 HVAC System Maintenance at WVNET
Renovation, Term Contract
Post-Bid
Morgantown, WV 26505

Boiler Repairs - Salem Correctional Center and Jail
Results
$170,060 est. value
WV

Heating, Ventilation and Air Conditioning Retrofit, Renovation and Replacement
Post-Bid
Parkersburg, WV

Reported 05/07/2022 12:00 AM
Project Title

HVAC System for the Surgical Department Suite

Physical Address View project details and contacts
City, State (County) Keyser, WV   (Mineral County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of (2) existing rooftop mounted O.R. air handling units, reconfigure chilled water and heating water piping connections to new O.R. air handling units, heating water piping connection to existing boiler system, HVAC equipment controls connection to control panel, reconfigure chilled water piping to connect new chiller, new concrete pad mounted air cooled chiller unit at ground level for N+1 redundancy, new chilled water piping and controls to connect redundant chiller, new chilled water pumps, (3) replacement steam humidifiers, ductwork and grille modifications serving ED Triage, ED7, ED8, ED Decon, EVS Soiled Utility, Med Surg 11, & ICU Soiled Utility. Provide and install new Bacnet control panel, workstation, web based graphical user interface software for monitoring and control of chilled water system, air handling units 12,13,14, and all associated control points. Electrical Systems shall include HVAC equipment power distribution from emergency stand-by power for new O.R. air handling units, chillers, pumps, and humidifiers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents