Similar Projects
Bridge, Superstructure and Culvert Replacements, Watermain Relocation, Roundabout Construction, Interchange Reconstruction, Guardrail Work, Concrete Surface Coating, Approach Work and Pavement Markings
New Construction
Bidding
MI

Substructure Repairs Including Substructure Patching
New Construction
Bidding
Detroit, MI 48269

Topsoil
Post-Bid
Detroit, MI

Bridge Bundling Pilot
Post-Bid
Less than $20,000,000 est. value
Jackson, Lapeer, MI 48446

Replacement of One 39 Foot and on e 45 Foot Prefabricated Superstructures including Riprap, Pier Repairs, approach Work, Concrete Curb and Gutter, Drainage, Cofferdams and Guardrail
Results
MI

Bridge Rehabilitation including Partial Concrete Deck and Railing Replacement, Fascia T-Beam Replacement
Results
MI

Bridge Scaling and Plywood False Decking Removal and Disposal
New Construction
Bidding

US - 31 Bridge Rehabilitation Project (ATC for MOT)
Post-Bid
Less than $26,200,000 est. value
Grand Haven, MI 49417

Railroad Bridge Replacement over Manistee River
Results
Manton, MI 49663

Bridge Rehabilitation Including Partial Pier Replacement, Beam Repair, Steam Cleaning and Deck Repair
New Construction
Bidding
Williamston, MI 48895

Iron Belle Trail Bridge
Post-Bid
Petoskey, MI 49770

Bridge Rehabilitation including Epoxy Overlay, Full Depth Deck Patching, Steel Repair, Substructure Repair, Partial Painting, Guardrail Anchorage Replacement and Pavement Markings on 2 Bridges
Results
Flint, MI 48501

Bridge Rehabilitation and Road Reconstruction
New Construction, Infrastructure
Bidding
Allegan, MI

Blue Water Bridge Snow Removal Services, Port Huron
Term Contract
Post-Bid
Port Huron, MI 48060

Porcupine Mountains Wilderness State Park, Iron Belle Trail Pedestrian Bridge
Results
Ontonagon, MI 49953

Reported 08/03/2021 12:39 PM
Project Title

Sault Snowmobile Association - Walmart Bridge Replacement

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49783   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method
Project Status Construction Commenced July 2021, Construction Completion Expected August 2021
Bids Due View project details and contacts
Estimated Value $124,440
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents