Similar Projects
REBID Stevens Barracks Roof Replacement 2022
Renovation
Sub-Bidding
$700,000 CJ est. value
Charleston, SC 29403

TOC -Roofmg Contracting Services
Alteration
Post-Bid
Charleston, SC

Bldg 198 Water Intrusion
Term Contract
Post-Bid
$100,000 to $250,000 est. value
North Charleston, SC 29405

Summerall Chapel Roof Replacement
Results
$500,000 to $800,000 est. value
Charleston, SC 29409

MUSC Quad F Roof Replacement
Results
$400,000 to $500,000 est. value
Charleston, SC 29425

Buildings B and E Roof Replacement - Brighton Place
Renovation
Construction
$56,875 CJ est. value
Charleston, SC 29407

Replace the Existing Roof Coverings
Alteration
Post-Bid
North Charleston, SC 29418

Hollings Cancer Center 4Th Floor Roof Repairs
Alteration
Results
$625,000 to $725,000 est. value
Charleston, SC 29425

Roofing and Building Envelope Professional Services
Term Contract, Alteration
Post-Bid
Charleston, SC 29409

Old Children's Hospital Select Roof Replacements-Repairs
Alteration
Results
$1,500,000 to $2,000,000 est. value
Charleston, SC 29425

Roof Replacement at CCHRA (Charleston County Housing and Redevelopment Authority) Scattered Sites
Alteration
Post-Bid
$160,000 est. value
Charleston, SC 29403

Town Hall Roof Replacement
Alteration
Results
Seabrook Island, SC 29455

2022 Park Roofs
Renovation
Post-Bid
$220,000 CJ est. value
Hollywood, SC 29449

Ashley Oaks Apartments Re-Roofing
Alteration
Results
Charleston, SC 29407

Roof and Gutter Replacement
Alteration
Post-Bid
$100,000 to $250,000 est. value
Mount Pleasant, SC 29464

Last Updated 12/20/2022 10:05 PM
Project Title

Colbert Education Center and Library Roof Replacement

Physical Address View project details and contacts
City, State (County) Charleston, SC 29425   (Charleston County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $932,708 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope includes roof replacement with removal of existing gravel surface built up roof system down to concrete roof deck, installation of vapor retarder, installation of lightweight insulating concrete system with insulation, and installation of a two ply modified bitumen roof system. Alternate No. 1: Adds roof replacement of adjacent connector. Alternate No. 2: Substitutes polyisocyanurate and coverboard for lightweight insulating concrete. Construction Cost Range: $650,000 - $800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents