Similar Projects
The Village at Oakland Park
New Construction
Conception
Oakland Park, FL 33311

Lee Square
New Construction - 24,120 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

CenterPlace - Master Plan
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Myers, FL

Naples Beach Hotel & Golf Club Redevelopment
New Construction, Demolition
Design
$10,000,000 CJ est. value
Naples, FL

City of Inverness Wallace Park, Liberty Park, Downtown Depot and Water Tower
Post-Bid
Inverness, FL

Orlando Tennis Center
Post-Bid
Less than $5,500,000 est. value
Orlando, FL

Foxtail Palm Park Improvements
Results
Less than $603,741 est. value
Palm Springs, FL 33461

Newsom High School Construction of ROTC Obstacle Course Construction
Results
Less than $100,000 est. value
Lithia, FL 33547

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

Oakland Park Place
New Construction - 291,212 SF
Design
$560,000 est. value
Oakland Park, FL 33334

Celebration Elementary Playground Artificial Turf Modifications
Post-Bid
Celebration, FL 34747

Lynn Haven Sports Fields Improvements Cain Griffin Park
Results
Lynn Haven, FL 32444

Lake Lorna Doone Park Improvements - Phase II
New Construction, Renovation, Demolition
Construction
$8,000,000 est. value
Orlando, FL 32805

Pine Island Park Reconstruction
Post-Bid
Less than $7,416,001 est. value
Plantation, FL 33324

Last Updated 10/09/2020 09:04 AM
Project Title

Design Build Services for Dr. Martin Luther King Jr. Park South Shore ADA Improvements

Physical Address View project details and contacts
City, State (County) Winter Haven, FL 33880   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $964,696
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project is anticipated to include all survey, engineering, landscape architecture, architecture, specifications, public involvement, and construction to complete the design elements. Improvements are based around ADA improvements to the park. These include but are not limited to: •New restroom with shaded ADA accessible observation deck and concession serving area •New ADA walkways throughout the park which will function as a loop pathway and also connect to other external pedestrian infrastructure •New MLK Jr. Monument & Educational Kiosk -envisioned to utilize existing plaques •New shaded picnic areas •New Adaptive Water Ski Transition Areas at the water edge •New ADA accessible dock and fishing pier at existing the boat ramp •New site amenities •New landscaping •All demolition and site work needed to complete the above tasks •Tie ins and transitions in and around the newly renovated amphitheater and South Lake Silver Drive Complete Street Project currently underway will be necessary The current allocated funds for the project are $964,696 ($564,969 City + $200,000 FRDAP + $200,000 Legislative Appropriation) US dollars. Certain reporting and special requirements will be necessary. Design is anticipated to commence Fall 2020 followed by construction in Summer 2021 and completion by late 2021.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents