Similar Projects
Summer 2021 Paving / Reclamation Projects
Infrastructure
Post-Bid
White River Junction, VT

Cavendish-Weathersfield ER STP 0146 (14)
Results
$500,000 to $1,000,000 est. value
Cavendish, Weathersfield, VT 05142

2020 Paved Highway Rehabilitation
Results
$1,400,000 est. value
Sharon, VT 05065

Pomfret Pavement Rehabilitation
Results
$690,000 est. value
Pomfret, VT

Replace Asphalt Pavement, North Hartland Lake, North Hartland, VT
Results
North Hartland, VT

Hartford Roundabouts and Sidewalk
Results
$5,000,000 to $10,000,000 est. value
Hartford, VT 05001

Commonwealth Avenue Paving Project
Results
Ludlow, VT 05149

Route 35 Improvements Phase 3
Results
$206,245 est. value
Chester, VT 05143

Windsor-Hartland STP FPAV (31)
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Hartland, Windsor, VT 05089

Sharon-Bethel IM 089-1 (66)
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Bethel, Sharon, VT 05065

South Main Street Utility and Roadway Improvements Project
Results
$2,560,000 est. value
Hartford, VT

Statewide STP Crak (40)
Results
$500,000 to $1,000,000 est. value

Statewide STP Crak (39)
Results
$500,000 to $1,000,000 est. value

2020 Crack Sealing
Results
Sharon, VT

Pleasant and Terrace Street Roadway Rehabilitation and Elm, Crystal and Hall Street Complete Roadway and Utility Reconstruction Project
Results
Windsor, VT

Last Updated 07/01/2021 12:00 PM
Project Title

2021 Paving

Physical Address View project details and contacts
City, State (County) Weathersfield, VT   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to cold plane entire project 3 inches deep. Reclaim the entire project to an 8-inch depth. Grade road to re-shape to attain standard cross slope for drainage. Compact gravel sub-base. Pave 2.0- inch base course of Type II 75 Blow Marshall. Pave 1.5-inch top course of Type III 75 Blow Marshall Bituminous Concrete Pavement. Apply emulsion before paving topcoat. Cold planning beginning and end project tapers, cold planning shoulder and side road tapers. Pave driveway and side road aprons to a 2’ minimum length. Backup drives & shoulders, and mailbox pullouts with shoulder gravel (NOTE: include separate line for shoulder, driveway, and mailbox pullout gravel work.) provide traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents