Similar Projects
Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition
Conception
Cadet, MO 63630

New Elementary School
New Construction
Conception
Columbia, MO 65203

Webb City American Legion Hall
Renovation
Bidding
Webb City, MO

Monroe Elementary School - Phase I Alterations
Renovation
Bidding
Saint Charles, MO 63301

Christian Ott Elementary Secure Entry Remodel
Renovation - 2,500 SF
Sub-Bidding
Independence, MO 64050

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Senior High School 'C' Building
New Construction
Results
Sikeston, MO 63801

Mark Twain Elementary Gym-Music safe Room and Eugene Elementary Gym-Music safe Room
Addition
Results
Springfield, MO 65807

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

New Elementary School
New Construction
Conception
Columbia, MO

Sports Flooring Installations at Butcher-Greene & Meadowmere Elementary Schools
Addition, Alteration
Bidding
Grandview, MO 64030

Washington MS, Four Rivers Career Center Nurse Simulation Lab
Renovation, Addition
Post-Bid
Washington, MO 63090

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

Last Updated 02/18/2022 08:52 AM
Project Title

FEMA Safe Room for Walnut Grove R-V School

Physical Address View project details and contacts
City, State (County) Walnut Grove, MO 65770   (Greene County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Muliti Purpose FEMA Safe Room addition (shell) and connecting corridors at the K-12 campus for Walnut Grove R-V Schools. Additions include 5,073 sq ft. safe room, with 1,659 sq ft. of connecting corridors. The work consists of, but is not limited to, selective demolition of existing sidewalks, parking, and partial building; site work; new construction of precast concrete walls and double tee roof panels; structural steel framing; concrete; TPO roof systems; FEMA 361 rated windows and doors; electrical; mechanical; plumbing; and interior fnish work.

Details

Middle/Senior High School, 5,073 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents