Similar Projects
Water Treatment Plant Improvements - General Construction
Renovation
Bidding
$1,500,000 to $1,800,000 est. value
Greencastle, PA 17225

Nitrate Removal System and Building Addition Project - General/Mechanical Construction
Addition
Bidding
Douglassville, PA

Construction of the Loysville Inflow and Infiltration Project
Post-Bid
Loysville, PA 17047

Wastewater Treatment Plant Expansion Project
Post-Bid
Mars, PA 16046

WWTP Improvements - General Construction
Renovation
Results
$6,000,000 to $6,400,000 est. value
Bloomsburg, PA 17815

Wastewater Treatment Plant Upgrades Project - General/Mechanical Construction
Results
$36,900,000 to $43,000,000 est. value
New Castle, PA 16101

Wastewater Treatment Plant Improvements
Renovation
Construction
Pocono Lake, PA 18347

Pretreatment Building Restoration at Queen Lane WTP
Renovation
Construction
$5,000,000 est. value
Philadelphia, PA 19129

Aspinwall WTP Filter Building Sodium Hypochlorite Improvements - General/Mechanical
New Construction, Alteration
Bidding
Pittsburgh, PA 15238

Bulk Purchase of Magnesium Hydroxide for the Johnstown Regional Wastewater Treatment Plant
Post-Bid
Johnstown, PA 15901

Northside Pump Station and Wastewater Treatment Plant (WWTP) Improvements - General/Mechanical
Results
Oil City, PA 16301

Furlong/Buckingham Village Water Interconnect
Renovation
Bidding
Buckingham, PA

Cleaning of Oil/Water Separators
Post-Bid
PA

New Stanton WPCP UV Disinfection System - General Mechanical
Results
New Stanton, PA 15672

Holly Acres Estates
Renovation, Alteration
Bidding
Erie, PA 16509

Last Updated 10/06/2021 05:05 PM
Project Title

Y1DZ--Chiller Plant construction-Erie VAMC Project Number 562-14-115

Physical Address View project details and contacts
City, State (County) Erie, PA   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Veterans Affairs Medical Center, Erie, PA requires construction of a Chiller Plant for the Erie VAMC.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents