Similar Projects
2021 Sanitary and Storm Sewer Video Inspection and Cleaning Services
Infrastructure
Bidding
Erie, CO

Bohn Park Stormwater Improvement Project
Infrastructure
Bidding
Lyons, CO 80540

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

Pipe Lining Projects
Results
Colorado Springs, CO 80903

Arvada and Franktown Permanent Water Quality Structure Installation
Post-Bid
$54,000 est. value
Arvada, CO 80007

Grease Interceptors Maintenance Service
Term Contract
Results
Less than $184,760 est. value
Sterling, CO

ACGC Weir Improvements
Post-Bid
Peyton, CO

Last Updated 06/09/2021 02:40 PM
Project Title

2021 Capital Improvement Program(CIP)Project

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located within the City of Greenwood Village, Colorado and includes, but is not limited to: 6,401 linear feet of 8-inch CIPP rehabilitation, remove 106 manhole steps, various minor manhole repairs, and coordination with the Owner, all as described in the Contract Documents

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents