Similar Projects
Lee Square
New Construction - 24,120 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Pine Bay
New Construction - 314,568 SF
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33415

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Basketball and Tennis Court Resurfacing
Post-Bid
Palm Beach Gardens, FL 33410

Jupiter Beach Park - Pavilion Refurbishment
Term Contract
Results
Jupiter, FL 33477

Design, Construct, Operate, and Maintain a Park and Related Accessory uses and Facilities
Results
Westlake, FL 33470

Atlantic Crossing Artwalk
New Construction - 1,500 SF
Construction
Less than $500,000 CJ est. value
Delray Beach, FL 33483

South Olive Tennis Center
Construction
West Palm Beach, FL 33405

Canyon District Park Phase 1
New Construction - 2,600 SF
Post-Bid
Boynton Beach, FL 33472

John Prince Park Campground Phase 3
Results
Less than $2,100,000 est. value
West Palm Beach, FL

Wildflower Park and Silver Palm Park Renovation and Improvements
Post-Bid
Boca Raton, FL 33432

Premium Crushed Red Shale Warning Track
Results
Boca Raton, FL 33432

Waterslide Restoration, Coconut Cove Waterpark
Post-Bid
Boca Raton, FL 33498

Sugar Sand Park Fieldhouse Bleacher Replacement
Results
Boca Raton, FL 33486

Tennis Court Maintenance Equipment, Supplies, and Installation
Post-Bid
Boca Raton, FL 33432

Last Updated 05/26/2021 02:09 AM
Project Title

Construction Manager at Risk Services for Rutherford Park and Lake Wyman Park Restoration and Improvements

Physical Address View project details and contacts
City, State (County) Boca Raton, FL 33431   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the existing boardwalk template (1,860 LF X 8 feet/14,880 square feet) and construct additional boardwalk to the existing boardwalk (1,060 LF X 8 feet/8,480 square feet). Install two (2) new shade structures (16-feet X 16-feet) and construct one (1) pavilion (24-feet X 24-feet), replace the existing pavilion with shade structure (16-feet X 16-feet), and restore existing pavilion (24-feet X 24-feet) totaling 1,920 square feet. Construct a new observation pier consisting of an access walkway (170 feet X 8 feet/1,360 square feet) and platform (20 feet X 20 feet/400 square feet). Construct three (3) walking paths totaling 47,280 square feet consisting of a north trail (1,138 feet X 10 feet/11,380 square feet), a central trail (860 feet X 10feet/8,600 square feet) and a south trail (2,730 feet X 10 feet/27,300 square feet)

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents