Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 CJ est. value
Tacoma, WA 98409

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

SR 410/Rock Creek Vic - Chronic Environmental Deficiency
Infrastructure
Design
$3,562,000 CJ est. value
Naches, WA 98937

Thornton Street, Vista Drive to Malloy Avenue Project
Infrastructure
Bidding
$4,750,000 CJ est. value
Ferndale, WA 98248

RFP D/B - Auburn Station Parking and Access Improvement Design Build Project
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Auburn, WA 98001

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

Reservoir Cover Replacement
New Construction
Results
$2,000,000 est. value
Aberdeen, WA

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Gridline Apartments
New Construction, Infrastructure
Pending Verification
$66,400,000 CJ est. value
Seattle, WA 98122

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Conception
$735,000 CJ est. value
Toppenish, WA 98948

Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

98th Avenue Southeast and Southeast 11th Street Slope Stabilization
Infrastructure
Bidding
$525,220 CJ est. value
Bellevue, WA 98004

Last Updated 09/20/2022 05:05 AM
Project Title

John Day Lock and Dam, Navigation Lock, Downstream Gatebearing Shoe Repair, Phase2

Physical Address View project details and contacts
City, State (County) Goldendale, WA 98620   (Klickitat County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,630,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 16, 2022 Contract Award Number: W9127N22C0017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: S6HKH3KV35N3 Contractor Awarded Name: Knight Const. & Supply, Inc. Contractor Awarded Address: Deer Park, WA 99006-5381 USA Base and All Options Value (Total Contract Value): $1630600.00 The U. S. Army Corps of Engineers (USACE), Portland District, seeks a contractor to perform the construction of John Day Navigation Lock Downstream Gate Bearing Shoe Repair - Phase 2, and incidental related work. The work includes replacement of approximately 72 ft of bearing shoes as base CLINs ('Middle 1/3') and 90 ft of bearing shoes as optional CLINs ('Top 1/3') for the north and south sides of the Navigation Lock Downstream Gate and incidental related work. Presently, the bearing shoes are at risk of failure due to sustained lateral cracking along the epoxy fill holes. This is a follow-on effort of the previous 'Bottom 1/3' of the bearing shoes that were replaced in March 2018. The work is located at the Navigation Lock of John Day Dam, in Klickitat County, Washington. Magnitude of Construction: Between $1,000,000 and $5,000,000. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Clinton Jacobsen, via email at clinton.m.jacobsen@usace.army.mil prior to proposal closing date. . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents