Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

Construction On State Highway In San Diego County
Infrastructure
Bidding
$42,000,000 CJ est. value
San Diego, CA 92124

Construction On State Highway In San Diego County
Infrastructure
Bidding
$42,000,000 CJ est. value
San Diego, CA 92124

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Aviara Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Carlsbad, CA 92011

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Last Updated 11/04/2022 08:02 AM
Project Title

Operational and ITS Improvements, Overhead Sign Structures / Panels and Lighting Upgrades, ADA Curb Ramp

Physical Address View project details and contacts
City, State (County) Encinitas, CA 92007   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $21,508,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Operational and ITS Improvements, Overhead Sign Structures / Panels and Lighting Upgrades, ADA Curb Ramp Project ID : 1118000134 Bkpm: 42.2 Ahpm : 47.1 Proposed Advertise Date : 11/15/2022 As of November 04, 2022, the project is in Final Planning status. Anticipated construction year is 2023. CADOT - Operational and ITS Improvements, Overhead Sign Structures / Panels and Lighting Upgrades, ADA Curb Ramp *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents