Similar Projects
Exterior Electrical Site Work at Warner Elementary School
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Springfield, MA 01129

Exterior Electrical Site Work at Pottenger Elementary School
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Springfield, MA 01104

Emergency Generator
Alteration
Post-Bid
$70,000 est. value
Holyoke, MA

Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade
Alteration
Post-Bid
$343,000 est. value

Mass Mutual Center Air Handling Unit Repair Project - Filed Sub Bids
Alteration
Results
$4,700,000 est. value
Springfield, MA 01103

Building 16 Radio Station Renovation - Filed Sub Bids
Alteration
Results
$539,000 est. value
Springfield, MA

Electric Distribution Transformers
Alteration
Post-Bid
Holyoke, MA

Building 17 Dual-Purpose Docking Station with Camlock Connections
Alteration
Results
$168,680 est. value
Springfield, MA

Generator Repair Service
Alteration
Post-Bid
Chicopee, MA

15KV Uninterrupted Power Supply
Alteration
Results
Holyoke, MA

On-Call Electrician
Alteration
Post-Bid
$50,000 est. value
Longmeadow, MA

B20 to B17 Robotics and Electronics Relocation - Filed Sub Bids
Alteration
Results
$631,000 est. value
Springfield, MA 01105

Repair and Renovation of Big Stewart Pump Station
Alteration
Post-Bid
Westfield, MA 01085

Roof Repairs at Three Holyoke Elementary Schools - Filed Sub Bid
Alteration
Results
$6,200,000 est. value
Holyoke, MA 01040

Generator Repair/Replacement - General Bid
Alteration
Post-Bid
$1,228,492 est. value
Holyoke, MA 01040

Last Updated 05/08/2023 04:34 PM
Project Title

Springfield Water and Sewer Commission (SRWTF) Grit Removal Upgrade Project - Sub

Physical Address View project details and contacts
City, State (County) Agawam, MA 01001   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs RE: Notice of Prequalified General and Filed Sub Bidders; Springfield Water and Sewer Commission IFB No. 23-47; SRWTF Grit Removal Upgrade Please be advised that the Springfield Water and Sewer Commission (Commission's) RFQ Prequalification Committee has reviewed and ranked all submitted Statements of Qualifications for RFQ No. 23-39 General Contractors (GC) and RFQ No. 23-38 for Trade Contractors (Electrical or Miscellaneous and Ornamental Iron). This prequalification selection was completed on March 9, 2023. The following firms have been prequalified and are hereby invited to submit a bid for the Construction Bid portion of this project, which will be identified as Commission IFB No. 23-47; SRWTF Grit Removal Upgrade. Sub Bidder Question Period Ends- 4/27/23, 4:30 P.M. Estimated Start Date- 6/22/23 Estimated Substantial Completion Date- 6/22/25 The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. Project Description: Project consists of construction of a new Grit Removal System at the Springfield Regional Wastewater Treatment Facility (SRWTF), consisting of four (4) mechanically induced vortex units upstream of the Primary Sedimentation Basins and constructed with a drilled micropile foundation. Influent and effluent channels, slide gates, platforms, stairs, handrails, and guardrails will be installed around the vortex units. Four (4) grit pumps with associated piping, appurtenances, instrumentation and controls, and grit handling equipment including two (2) classifiers and six (6) hydrocyclones, along with replacement of primary sludge and grit slurry piping, are included. Other work includes installation of electrical and instrumentation and controls systems, relocation of existing utilities, and site restoration. The estimated project value is $25 Million. All questions must be made in writing and received by the SWSC Chief Procurement Officer, Theo G. Theocles, Esq., no later than April 27 at 4:30p.m. for FSB's and no later than May 4, 2023 at 4:30 p.m. for General Contractor Bidders via the following contact: theo.theocles@waterandsewer.org with cc to Hannah Kominske, HKominske@kleinfelder.com. CWSRF-7223

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents