Last Updated | 05/08/2023 04:34 PM |
Project Title | Springfield Water and Sewer Commission (SRWTF) Grit Removal Upgrade Project - Sub |
Physical Address | View project details and contacts |
City, State (County) | Agawam, MA 01001 (Hampden County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs RE: Notice of Prequalified General and Filed Sub Bidders; Springfield Water and Sewer Commission IFB No. 23-47; SRWTF Grit Removal Upgrade Please be advised that the Springfield Water and Sewer Commission (Commission's) RFQ Prequalification Committee has reviewed and ranked all submitted Statements of Qualifications for RFQ No. 23-39 General Contractors (GC) and RFQ No. 23-38 for Trade Contractors (Electrical or Miscellaneous and Ornamental Iron). This prequalification selection was completed on March 9, 2023. The following firms have been prequalified and are hereby invited to submit a bid for the Construction Bid portion of this project, which will be identified as Commission IFB No. 23-47; SRWTF Grit Removal Upgrade. Sub Bidder Question Period Ends- 4/27/23, 4:30 P.M. Estimated Start Date- 6/22/23 Estimated Substantial Completion Date- 6/22/25 The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. Project Description: Project consists of construction of a new Grit Removal System at the Springfield Regional Wastewater Treatment Facility (SRWTF), consisting of four (4) mechanically induced vortex units upstream of the Primary Sedimentation Basins and constructed with a drilled micropile foundation. Influent and effluent channels, slide gates, platforms, stairs, handrails, and guardrails will be installed around the vortex units. Four (4) grit pumps with associated piping, appurtenances, instrumentation and controls, and grit handling equipment including two (2) classifiers and six (6) hydrocyclones, along with replacement of primary sludge and grit slurry piping, are included. Other work includes installation of electrical and instrumentation and controls systems, relocation of existing utilities, and site restoration. The estimated project value is $25 Million. All questions must be made in writing and received by the SWSC Chief Procurement Officer, Theo G. Theocles, Esq., no later than April 27 at 4:30p.m. for FSB's and no later than May 4, 2023 at 4:30 p.m. for General Contractor Bidders via the following contact: theo.theocles@waterandsewer.org with cc to Hannah Kominske, HKominske@kleinfelder.com. CWSRF-7223 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |