Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Castle Island Montessori School Relocation
Renovation - 6,400 SF
Design
Albany, NY 12207

AutoZone #4716 / Jamaica
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
New York, NY 11433

RFP D/B - Design-build Services for I-81 Viaduct Project - Phase 1, Contract 1
Infrastructure
Bidding
$300,000,000 CJ est. value
Syracuse, NY 13205

Port of Albany Expansion - Wharf Construction
Addition, Demolition, Infrastructure
Bidding
$120,000,000 CJ est. value
Albany, NY 12202

2020 Capital Improvement Project Phase 1 - Ellenville Elementary School- Contract 6: Roofing Work
Renovation
Sub-Bidding
$700,000 CJ est. value
Ellenville, NY 12428

Union-Endicott CSD 2019 Capital Improvements Phase 2
New Construction
Post-Bid
$250,000 to $4,600,000 est. value
Endicott, NY 13760

Harrington Heights - Site Development
New Construction
Post-Bid
Poughkeepsie, NY 12601

Onondaga-Cortland-Madison - Mcevoy Educational Center Kitchen Reconstruction
Results
Less than $500,000 est. value
Liverpool, NY 13088

Wavervliet CSD - 2020 Capital Project
Renovation
Results
$600,000 to $2,400,000 est. value
Watervliet, NY 12189

Skaneateles CSD Capital Project 2021-Phase II
Construction
Less than $25,200,000 est. value
Skaneateles, NY 13152

Skaneateles CSD Capital Project 2021-Phase II
Construction
Less than $25,200,000 est. value
Skaneateles, NY 13152

VanBurenville Road Solar
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Middletown, NY 10940

Webster Avenue Hotel / Bronx
Demolition, New Construction, Infrastructure - 28,329 SF
Pending Verification
$20,500,000 CJ est. value
New York, NY 10467

Reconstruction of Del Valle Square
Infrastructure
Design
$14,810,224 CJ est. value
New York, NY 11101

Last Updated 08/19/2022 03:01 PM
Project Title

2021 Capital Outlay Project Contract No. 1 - Sitework

Physical Address View project details and contacts
City, State (County) Plattsburgh, NY 12901   (Clinton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 - Sitework (est. value $80,000) Contractors may inspect the site and building by scheduling an appointment with Norbert Neiderer, Director of Buildings and Grounds (nneiderer@plattscsd.org). Requests for information, interpretation and clarification shall be made to the Architect utilizing the RFI form bound in the Contract Documents. The deadline for RFI submissions shall be 4 business days prior to the bid opening. RFI's received after that date will not be answered. Addenda addressing RFI's will be issued to the Plan Holders of Record. Each Bidder is responsible to confirm receipt of all Addenda. Failure to do so shall not relieve the Bidder of his obligations under the submitted Bid Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the title of the project, and the name, address and phone number of the bidder. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. Bid security shall be in an amount not less than 5% of the base bid or not less than 5% of the sum of base bids where such base bids may be considered cumulative. Such checks will be returned to all except the three lowest formal bidders, within three working days after the formal opening of bids & the remaining cash or checks will be returned to the three lowest bidders within 48 hours after the Owner and the accepted bidder have executed a contract. If no contract has been so executed within 45 days after the opening of bids, bid security will be returned upon demand of the bidder at any time thereafter so long as he has not been notified of the acceptance of his bid. Simultaneously with his delivery of the executed contract, the successful bidder must deliver to the Owner three (3) originals of an executed bond in the amount of 100% of the accepted bid as security for the faithful performance of the contract and for the payment of all persons performing labor or furnishing materials in connection therewith, prepared in the standard form of Performance Bond, Labor and Materials Payment Bond, AIA Form A312-2010 and having as surety thereon such surety company or companies as are acceptable to and approved by the Owner, and as are authorized to transact business in New York State. Each Bidder must obtain and submit with his Bid the Statement of Surety's Intent attached to the Bid form, completed and signed by a duly authorized surety company licensed to do business in New York State. This requirement will not apply in the case of contracts for supplies only and involving no labor on the site. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General Conditions. Each bidder must deposit with his bid, security in the form described, and subject to the conditions provided in the "INFORMATION FOR BIDDERS". Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. No bidder may withdraw his bid within 45 business days after the date of the opening of bids.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents