Similar Projects
Last Updated | 12/16/2020 12:30 AM |
Project Title | Construction of the Westheimer Parkway Trail Crossing |
Physical Address | View project details and contacts |
City, State (County) | Katy, TX (Fort Bend County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct approximately 1000LF of 6 inch sidewalk, 600LF of 4-5 ft cast in place reinforced concrete retaining wall and safety handrailing, regrade 300LF of backslope interceptor swales and construct two concrete manholes and two 24 inch corrugated metal pipe outfalls in existing Willow Fork Drainage Ditch. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |