Similar Projects
Reported | 05/07/2022 12:00 AM |
Project Title | Install Backflow Preventers at EPF |
Physical Address | View project details and contacts |
City, State (County) | FL (Brevard County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. Bids by Invitation. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, equipment, materials, and transport necessary in performing all work required to install two 12" Ames 4000SS reduced pressure back flow preventer (BFP) assemblies, one for each of the two existing potable water meters servicing the Eastern Processing Facility (EPF), Facility 20701, at Cape Canaveral Space Force Station (CCSFS). Provide the government a complete and usable facility in accordance with the Project Drawings and Specific on Cape Canaveral Space Force Station (CCSFS), FL. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |