Similar Projects
Water Improvement District 2021-1 Pump House and Reservoir Improvements
Renovation, Alteration
Bidding
$475,000 est. value
Bismarck, Coleharbor, ND

Water Improvement District 2021-1 Pump House and Reservoir Improvements
Renovation, Alteration
Bidding
$475,000 est. value
Bismarck, Coleharbor, ND

West End Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

GSR and Pump Station Replacement
Results
$1,200,000 est. value
Cavalier, ND

2021-1 Lift Station Improvements
Renovation
Bidding
Portland, ND

Fargo Red River Pump Station Improvements
Renovation
Results
$5,500,000 est. value
Fargo, ND

Leachate Forcemain and Lift Station
Results
$801,000 est. value
Dickinson, ND

Upgrade Lift Station 12 and Lift Station 13
Renovation
Results
$775,000 est. value
Grand Forks, ND

Lift Station Improvements
Renovation
Results
$800,000 est. value
Jamestown, ND

Sewer Improvement District No. 2019-1
Results
$5,000,000 to $5,400,000 est. value
Kindred, ND

Velva Goldade Lift Station Replacement
Renovation
Results
$400,000 to $500,000 est. value
Velva, ND

Storm Sewer Lift Station Rehabilitation/Reconstruction and Incidentals Improvement
New Construction
Results
$904,538 est. value
Fargo, ND

Sanitary Sewer Lift Station Sewer System Rehabilitation, Replacement, and Incidentals
Renovation
Results
$675,000 est. value
Fargo, ND

Water and Sewer Improvement District 63, North-Central Trunk Sewer
New Construction, Infrastructure
Results
$1,935,000 est. value
Mandan, ND

Reported 01/28/2022 12:00 AM
Project Title

Master Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Valley City, ND   (Barnes County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000 to $250,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization, bonding and insurance; Master Lift Station improvements include removal and replacement of piping, fittings, valves and flow meter; temporary sewer bypass; sewer force main replacement; gate valve and box; connections to existing force main; surface restoration and other miscellaneous items.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents