Similar Projects
Defense Engineering Expansion
Addition - 534,000 SF
Conception
$1,100,000 est. value
Dillon, SC

Skutchi Designs
New Construction - 85,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Conway, SC 29526

Project Aspen Industrial Park
New Construction
Design
Rock Hill, SC

Cleveland Farms Winery
New Construction
Design
Williamston, SC 29697

Paving Project
Renovation, Alteration
Bidding
Rock Hill, SC 29732

MTU Remanufacturing Facility
Addition - 150,000 SF
Post-Bid
Graniteville, SC 29829

Arthrex Manufacturing - Phase II
New Construction - 191,266 SF
Post-Bid
$10,000,000 CJ est. value
Sandy Springs, SC

Design, Construction, and Installation of a Measurement and Regulation Station
Results
Fountain Inn, SC

Convenience Center Construction
New Construction
Results
Spartanburg, SC 29316

Think Tank Brew Lab
Renovation - 21,000 SF
Construction
$25,000 est. value
Greenville, SC 29607

Glass WRX
Renovation - 85,000 SF
Construction
$1,500,000 est. value
Beaufort, SC

Tactical Medical Solutions
Build-Out
Pending Verification
Anderson, SC 29621

Ruiz Foods
Addition
Pending Verification
$40,000,000 est. value
Florence, SC

SETi Expansion
Addition
Conception
Columbia, SC 29209

McClancy Seasoning
Addition - 20,000 SF
Design
Fort Mill, SC 29707

Reported 02/15/2022 03:07 PM
Project Title

Unique Loom

Physical Address View project details and contacts
City, State (County) Rock Hill, SC 29730   (York County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced fourth quarter 2021, Construction Completion Expected March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Manufacturing/Processing Plant, 275,963 SF Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 32 - Exterior Improvements.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents