Similar Projects
PT Land Apartments
New Construction, Renovation
Conception
Cape Coral, FL 33904

Cape Coral Town Center
New Construction
Conception
Cape Coral, FL 33991

Oak Villages
New Construction
Design
$10,000,000 est. value
Fort Myers, FL 33966

Embers Lake Estates
New Construction - 4,673,403 SF
Design
Cape Coral, FL

Cape Coral Apartments
New Construction
Bidding
$60,000,000 est. value
Cape Coral, FL 33909

interior modernization of our public housing units
Renovation
Post-Bid

2010 Hanson Multi-Family Housing
New Construction
Post-Bid
Fort Myers, FL 33901

Co-Developer for Affordable Housing Development In Lee, Collier, Charlotte, and Hendry/Glades Counties
Results

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Bonita 75 Mpd Multi-Family
New Construction
Conception
Bonita Springs, FL 34135

Sanibel Passage
New Construction - 76,500 SF
Design
$42,000,000 est. value
Fort Myers, FL 33908

Monarch Apartments
New Construction - 9,000 SF
Post-Bid
Fort Myers, FL 33916

Prima Luce
New Construction
Construction
$127,000,000 est. value
Fort Myers, FL

11200 Mixed Use
New Construction - 50,000 SF
Conception
Fort Myers, FL 33905

Reported 07/07/2022 12:00 AM
Project Title

Gulf Coast Town Center

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33913   (Lee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $80,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a 316,865 SF, 4-story multi-family project from the ground up and associated site work. Also included will be a 3-story parking structure. Construction shall include, but is not limited to: civil work, pavers, landscaping, irrigation, fencing, concrete, precast concrete, lightweight concrete, masonry, brick stone veneer, structural steel, misc. metals, light gauge metal, millwork, finish carpentry, shelving, Shingle & TPO roofing, fireproofing, doors, card readers, windows, storefront, glass shower doors, glass railing, gypsum wallboard assemblies, flooring, EIFS, aluminum & fabric awnings, acoustical ceilings, exterior wood look panels, painting, wallcoverings, specialties, elevators, lockers, swimming pool & spa, Hardscapes ,fire sprinklers, plumbing, HVAC, electrical, and fire alarm.

Details

437,301 SF - Apartments/Condominiums, 4 Stories Above Grade, Approximately 316,865 SF New Construction, 277 Unit(s), Parking Garage, Approximately 120,436 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents