Similar Projects
Sewer System Expansion Phase 4B
Infrastructure
Bidding
Sanibel, FL

Septic System Repair and Replacement
Infrastructure
Bidding
FL

DCPS Anchor Academy School 247 Sanitary Repairs
Infrastructure
Sub-Bidding
Jacksonville, FL

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Septic Tank, Grease Trap, Lift Station and Sewage Hauling Services County Wide
Term Contract
Post-Bid
Viera, FL 32940

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

Sanitary Sewer Rehabilitation - Phase 4
Infrastructure
Bidding
Brooksville, FL

Septic Services
Term Contract
Post-Bid
Miami, FL

2018 CDBG Project, Sewer Manholes
Results
Apalachicola, FL

Sanitary Sewer Interceptor Rehabilitation
Infrastructure
Bidding
$2,013,043 est. value
FL

Sanitary Sewer Collection System Rehabilitation
Post-Bid
FL

60-Inch Force Main (NL-1A) between the Intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue
Results
Less than $23,960,532 est. value
North Miami Beach, FL 33162

City-Wide Sanitary Sewer Cleaning and Inspection
Term Contract
Bidding
Sarasota, FL

Trenchless Pipe Installation and Pipe Rehabilitation Services
Post-Bid
FL

Reported 02/26/2022 12:00 AM
Project Title

Pelican Bay Boulevard Sewer Replacement

Physical Address View project details and contacts
City, State (County) North Naples, FL 34108   (Collier County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,150,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be done under this Contract involves inspection and replacement of a portion of the aged gravity sewer within the Pelican Bay Boulevard right-of-way while maintaining wastewater service to the surrounding Pelican Bay community. The construction portion of the project consists of three (3) new polymer concrete manholes, PVC gravity sewer (780± LF of 18” & 140± LF of 8”) with associated connections and cleanouts, gravity sewer grouting/abandonment of VCP, site restoration, and new landscaping. Also included is cleaning and video inspection of the complete gravity sewer trunkline within the Pelican Bay Boulevard right-of way. The size of this sewer varies and is comprised of approximately 2,000 LF of 8”, 3,400 LF of 12”, 5,500 LF 18”, and 5,200 LF 24”, primarily VCP.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents