Similar Projects
Last Updated | 07/21/2022 02:13 PM |
Project Title | FY 2023 Sergeant Road Trail Bridges No. 2 and 3 Replacement |
Physical Address | View project details and contacts |
City, State (County) | Waterloo, IA 50701 (Black Hawk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The extent of the work involved is removal of two failed wooden trail bridges and replacing them with a Reinforced Concrete Box Culvert (Location 2) and RCP culverts (Location 3), construction of PCC recreation trail at each location and required grading and stabilization. The work covered by this contract consists of furnishing all labor, equipment, and materials and performing all operations, in connection with the FY 2023 SERGEANT ROAD TRAIL BRIDGES NO. 2 AND 3 REPLACEMENT, Contract No. 107 |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |