Similar Projects
Powder Springs Resurfacing Project
Bidding
Powder Springs, GA 30127

Resurfacing Contract 2021-3, Local Roads (North)
Bidding
GA

NPHS Track Resurfacing
Post-Bid
Dallas, Douglasville, Hiram, Powder Springs, Rockmart, Temple, Villa Rica, GA 30132

Asphalt Paving, Patching and Resurfacing
Post-Bid
Dallas, Douglasville, Hiram, Powder Springs, GA 30157

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Street Resurfacing Project
Results
Atlanta, GA 30303

Sandtown Road Safety and Operation Improvements
Bidding
Marietta, GA 30067

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

City Wide Resurfacing Project
Results
Less than $1,399,805 est. value
Smyrna, GA 30080

2021 Resurfacing Program
Bidding
Marietta, GA

2021 Countywide Unit Price Contract
Term Contract
Post-Bid
Marietta, GA

Pavement Preservation Maintenance at Newnan, Powder Springs and Hamilton Mill Xpress Park and Ride Lots
Results
Hamilton, Newnan, Powder Springs, GA

Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

LMIG Resurfacing - General Paving Services
Results
Powder Springs, GA

Last Updated 09/04/2020 03:54 PM
Project Title

2020 City Wide Resurfacing Project

Physical Address View project details and contacts
City, State (County) Smyrna, GA 30080   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All sanitary and storm sewer manholes as well as valve boxes will be lowered and raised by the City. Any traffic loops will also be replaced by the City. Locations: Woodland Trail Cooper Lake Road Cooper Lake Road Collier Gate Court Whitfield Street Montclair Circle Montclair Court Inglewood Drive Fernanado Drive Fernanado Place Wynridge Drive Creatwood Trail Brown Circle Hughes Street Hills Street Mosswood Court Mosswood Lane Patricia Court Rosemoss Court

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents