Similar Projects
Reconstruction - I-95 Districts 6 and 7
Infrastructure
Bidding

Reconstruction - I-95 Districts 6 and 7
Infrastructure
Bidding

GLDTC 567 - Rothwell Drive/ Millport Circle Relocation
Post-Bid
$500,000 to $1,000,000 est. value
Mauldin, SC 29662

SCTAC Durability Track
Post-Bid
Greenville, SC

Clinton Recreation Complex
Results
$1,644,211 est. value
Clinton, SC

GLDTC 560.01 MMRP FY 19-20
Results
$1,500,000 to $2,000,000 est. value
Greenville, SC 29601

ACTC 121 Resurfacing Project
Infrastructure
Bidding
Anderson, SC

Asphalt Re-Striping and Resealing - CF Reames, McCants and Centerville
Term Contract
Post-Bid
Anderson, SC 29621

Computer Center Road Improvements Phase II
Results
$197,937 est. value
Clemson, SC 29631

City Street Resurfacing FY 21/22
Infrastructure
Bidding
Sumter, SC

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Post-Bid
SC

Paving At Mcbee High School
Results
Less than $223,754 est. value
McBee, SC 29101

Intersection Improvement - US 52/401/15
Infrastructure
Bidding
SC

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Street Ends Maintenance
Term Contract
Results
North Myrtle Beach, SC 29582

Last Updated 08/11/2021 09:48 AM
Project Title

Evergreen Cemetery Street Repair

Physical Address View project details and contacts
City, State (County) Chester, SC 29706   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Road Maintenance Contractors to patch and repair selected streets within the Evergreen Cemetery. The street repairs will include patching portions of Chestnut Lane, patching portions of Hickory Lane, patching portions of Magnolia Drive, patching portions of Hickory Lane, cleaning areas to be patched, tack coating edges with hot tar, completing with asphalt and compact, and filling in holes on graveled Palmetto Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents