Similar Projects
Garfield Community School Rear Parking Lot
Infrastructure
Bidding
$700,000 est. value
Menlo Park, CA 94025

2022 Pavement Maintenance Project
Infrastructure
Bidding
Millbrae, CA

Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

Outdoor Improvements at Four Sites
Infrastructure, Alteration
Post-Bid
Pacifica, CA 94044

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Middle Avenue and Nealon Park Pedestrian Improvements Project
Infrastructure
Results
Menlo Park, CA

Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

Sharon Road Sidewalk Installation Project
Infrastructure
Post-Bid
$600,000 est. value
Menlo Park, CA 94025

Hillside Boulevard Pedestrian Crossing Enhancements
Infrastructure
Results
South San Francisco, CA 94083

Citywide Street Rehabilitation Package 3-B (Phase 1) Project
Term Contract
Post-Bid
$3,100,000 est. value
San Mateo, CA

Midcoast Multi-Modal Trail Improvements Project
Infrastructure
Results
$3,332,000 est. value
CA

Kelly Avenue Intersections Project
Infrastructure
Post-Bid
$182,697 est. value
Half Moon Bay, CA 94019

Caltrain Access and Bay Trail Gap Closure
Infrastructure
Results
South San Francisco, CA 94080

North Pacifica Pedestrian Improvement
Infrastructure
Results
Pacifica, CA

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Last Updated 05/13/2022 02:41 AM
Project Title

2022 Sidewalk Repair Program

Physical Address View project details and contacts
City, State (County) Burlingame, CA   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work consists of, but not limited to removing and replacing sidewalk, driveway, curb ramps, curb and gutter, and associated restoration work and removing trees and grinding stumps

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents