Similar Projects
Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

Shannon Pumping Plant Intake Temporary Shoring Project
Infrastructure
Bidding
$1,534,700 CJ est. value
Sugar Land, TX 77479

Construction of the Thelen Storm Water Pump Station Expansion
Addition, Demolition, Infrastructure
Bidding
$2,000,000 CJ est. value
Katy, TX 77493

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Meter U Branch
Alteration
Post-Bid
Fulshear, TX

Proposed 8" Water Fill Line at South Regional Wastewater Treatment Plant
Results
Katy, TX

Construction of Water, Sanitary, and Drainage Facilities in Parks Edge Section 18
Results
TX

TDPS Driver License Office - Rosenberg
New Construction, Infrastructure - 23,212 SF
Construction
$3,400,000 CJ est. value
Rosenberg, TX 77471

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Lake Olympia at Vicksburg / The Shops at Lake Olympia
New Construction, Infrastructure - 17,400 SF
Design
$1,479,000 CJ est. value
Missouri City, TX 77489

FM 723 - Widen Road - Add Lanes
Infrastructure
Bidding
$117,979,167 CJ est. value
Richmond, TX 77406

Storm Sewer, Sanitary Sewer and Water Lines to Serve Briarwood Crossing Section 15 and Briarwood Crossing Drive Ext. Phase 2
Infrastructure
Post-Bid
TX

Water, Sanitary, Drainage and Paving Facilities in Stonecreek Estates Section 7
Results
TX

RFQ D/B - FY22 Capital Improvement Drainage Projects: Oyster Creek Diversion Channel and Detention Facilities
Infrastructure
Design
$960,000 CJ est. value
Sugar Land, TX 77478

Last Updated 09/17/2022 07:02 AM
Project Title

Off-site 6 Inch Force Main, 12 Inch Water Line and 10 Inch Collection Line to Serve Brazoria - Fort Bend Counties Municipal Utility District No. 3

Physical Address View project details and contacts
City, State (County) Katy, TX 77493   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,197,555 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Montgomery County Municipal Utility District No. 199 reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273). Bid security in the form of bid bond or cashier's check payable to D.R. Horton - Texas, Ltd. on behalf of Montgomery County Municipal Utility District No. 199 in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. Performance Bond: 100% Payment Bond: 100% Maintenance Bond: 100% Prevailing Wage Rate: YES The undersigned proposes, if awarded the Contract, to begin work as stipulated in the written Notice to Proceed issued by the Engineer, and to substantially complete the work within 70 calendar days after the date of the written Notice to Proceed and to complete the project within 90 calendar days after the date of the written Notice to Proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents