Similar Projects
Last Updated | 07/21/2023 11:07 AM |
Project Title | HVAC Replacement at the Hall County Department of Corrections Building |
Physical Address | View project details and contacts |
City, State (County) | Grand Island, NE 68801 (Hall County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Abandoned, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Hall County reserves the right to reject any or all bids, as deemed by the County Board of Commissioners, in the Board's sole discretion, to be in the best interest of the County. Jail Rooftop Unit Replacement 1. There are a total of 14 rooftop units (RTUs) serving the jail building that are approaching the end of their expected service life. 2. Provide and install RTUs with DX cooling to replace the existing units. a. Option 1: Replace units with like-for-like DX units with no part load compressor or fan modulation, airside economizer functionality, and induction gas heat. b. Option 2: Replace units with DX units with hot-gas-reheats with humidity controls, airside economizer functionality, and induction gas heat. c. Option 3: Replace units with DX units with variable speed units that provide humidity control, part load compressor and fan modulation to use less energy and provide better occupant comfort. 3. Shutdown the existing units and recover the refrigerant. 4. Disconnect and remove the RTUs. 5. New adapter curbs will be provided and installed on the existing roof curbs. 6. Hoist the new RTUs to the roof and secure it to the existing curbs. 7. Provide a full size drain off the RTUs. 8. Extend the existing electrical circuit to the RTUs and connect. 9. Extend the existing fire alarm shutdown circuits to the new RTUs and connect. 10. Start-up the new RTUs. 11. Provide test and balance of the new RTUs. 12. Units will be connected into the building's existing automation system. 13. Construction project management and project development. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |