Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

Trinity University Campus
New Construction, Renovation, Addition
Conception
$50,000,000 est. value
San Antonio, TX 78212

West Coast University
Renovation - 136,000 SF
Design
Richardson, TX 75080

Blinn College Rellis Student Building - Phase 2
New Construction - 80,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Bryan, TX 77807

Texas Advanced Computing Center Leadership Class Computing Facility Expansion
Addition
Bidding
Austin, TX

Bio/Bio New Growth Chambers
New Construction
Bidding
College Station, TX 77845

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

Kingwood Campus - Health Professions Center
New Construction - 49,000 SF
Post-Bid
Kingwood, TX 77339

BP10.110 Development Office Expansion
Results
Dallas, TX

UH Hilton College Renovation and Expansion
Renovation
Results
$30,400,000 est. value
Houston, TX

Renovate Smith Research Building Construction Manager at Risk
Renovation
Construction
Houston, TX 77054

UHD Science and Technology Building
New Construction - 105,696 SF
Construction
Houston, TX 77002

BCM Education Space
Renovation
Pending Verification
Houston, TX 77030

CTE Center - Phase 1 (Ag Science Center to House Animals)
New Construction
Pending Verification
$8,205,000 est. value
College Station, TX

BBHRB Vivarium and Office Building for the Center for Human Genetics
New Construction
Design
$10,500,000 est. value
Brownsville, TX 78520

Reported 08/27/2021 12:00 AM
Project Title

Blinn College Dreyer Field Upgrades (Brenham Campus)

Physical Address View project details and contacts
City, State (County) Brenham, TX 77833   (Washington County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a new locker room, team room and dugout facility as well as renovations to the press box, restrooms, concessions, and offices.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents