Similar Projects
Fy19 Post 45 Clouter Creek South Cell Dike Raise
Results
$10,000,000 to $25,000,000 est. value
Charleston, SC 29403

Town of Pageland Lake Terry Dam Repairs
Results
$40,000 to $45,000 est. value
Jefferson, SC

Twelve Mile Creek WCD Dam 12 (D1940)
Post-Bid
Pickens, SC

Repair of Twelve Mile Creek WCD Dam 12 (D1940)
Results
Less than $23,681 est. value
SC

FY20 Joint Based Charleston Cell Placement Area Dike Construction
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29403

Clearwater Lake Dam Repairs
Renovation
Results
$900,000 est. value
Clearwater, SC

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

Plum Island Wastewater Treatment Plant Interconnecting Tunnels
Post-Bid
$4,000,000 to $6,000,000 est. value
Charleston, SC 29401

Stone Lake Dam Outfall Stabilization
Results
Greenville, SC 29602

Emergency Repair - S-315 Gunter Road Pond Dam
Bidding
SC

Reported 12/12/2019 12:00 AM
Project Title

Gibson Pond Dam Replacement

Physical Address View project details and contacts
City, State (County) Lexington, SC   (Lexington County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolition and removal of all materials, to include concrete, lumber, and debris, associated with the existing dam and bridge; 2. Removal of abandoned gas line that runs along the downstream side of the existing spillway and dam 3. Excavation of overburden to expose competent rock surface 4. Cleaning and preparation of competent rock foundation surface 5. Construction of roller compacted concrete (RCC) or conventional concrete gravity dam structure 6. Construction of RCC or conventional concrete spillway sidewalls/training walls and non-overflow sections, to include ductile iron pipe low-level outlets 7. Construction of a reinforced concrete ogee crested spillway 8. Construction of reinforced concrete parapet 9. Installation of pedestrian bridge and fishing piers 10. Placement of rip-rap slope protection 11. Implementing and managing pollution control 12. Implementing and managing surface and ground water control measures 13. Permanent stabilization of disturbed areas.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents