Similar Projects
Reported | 12/12/2019 12:00 AM |
Project Title | Gibson Pond Dam Replacement |
Physical Address | View project details and contacts |
City, State (County) | Lexington, SC (Lexington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Demolition and removal of all materials, to include concrete, lumber, and debris, associated with the existing dam and bridge; 2. Removal of abandoned gas line that runs along the downstream side of the existing spillway and dam 3. Excavation of overburden to expose competent rock surface 4. Cleaning and preparation of competent rock foundation surface 5. Construction of roller compacted concrete (RCC) or conventional concrete gravity dam structure 6. Construction of RCC or conventional concrete spillway sidewalls/training walls and non-overflow sections, to include ductile iron pipe low-level outlets 7. Construction of a reinforced concrete ogee crested spillway 8. Construction of reinforced concrete parapet 9. Installation of pedestrian bridge and fishing piers 10. Placement of rip-rap slope protection 11. Implementing and managing pollution control 12. Implementing and managing surface and ground water control measures 13. Permanent stabilization of disturbed areas. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |