Similar Projects
Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

District 1 Guardrail Replacement
Infrastructure
Bidding
$500,000 CJ est. value
Bosler, WY 82051

District 5 Guardrail Replacement
Infrastructure
Bidding
$500,000 CJ est. value
Bosler, WY 82051

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Post-Bid
$170,000,000 CJ est. value
Laramie, WY 82070

AS/MB Meat Lab 136 Wash Down Piping Project
Infrastructure
Results
Laramie, WY 82072

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

Rail Tie Wind Project
New Construction, Infrastructure
Conception
$500,000,000 CJ est. value
Tie Siding, WY 82084

North Tank and Pipeline Project
Infrastructure
Results
$800,000 est. value
Laramie, WY

Boswell Drive Reconstruction - City of Laramie
Infrastructure
Conception
$1,150,000 CJ est. value
Laramie, WY 82070

Labonte Park Pond - City of Laramie
Infrastructure
Conception
$430,000 CJ est. value
Laramie, WY 82072

Ivinson Street Reconstruction - City of Laramie
Infrastructure
Conception
$3,400,000 CJ est. value
Laramie, WY 82070

Sewer Replacement - Ivinson Street 6th to 9th - City of Laramie
Infrastructure
Conception
$360,000 CJ est. value
Laramie, WY 82070

North 3rd Street - Sanitary Sewer Connection - City of Laramie
Infrastructure
Conception
$2,750,000 CJ est. value
Laramie, WY 82072

Last Updated 10/20/2022 03:07 PM
Project Title

RFP for Design Services - B2 Line Repl - Spring Creek Corthell to 15th - WWC-CP19014 - City of Laramie

Physical Address View project details and contacts
City, State (County) Laramie, WY 82072   (Albany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The B2 line is scheduled to be designed along with the Bill Nye Sewer project. This project will include at least one connection between the proposed Bill Nye line and the existing B2 line. The construction of the B2 line and the connecting line will need to be completed prior to the installation of the Bill Nye line. Sizing and alignment will be defined through the design contract. This project is included in the city's FY 2022-2026 Capital Improvement Program. As of October 20, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents