Similar Projects
Supply of AMI Equipment - Contract 5
Post-Bid
Less than $590,000 est. value
Fall River, MA

Filter Vessel Piping Fabrication
Post-Bid
Less than $10,000 est. value
North Attleborough, MA

Six (6) Inch Water Main Installation - Franklin Street
Results
Less than $60,000 est. value
Attleboro, MA

Pine Street Water Main Improvements
Results
Less than $1,950,000 est. value
Norton, MA 02766

Water Main Materials
Post-Bid
North Dighton, MA

Roy Avenue Water Main Replacement
Results
Less than $185,000 est. value
Attleboro, MA

Annual Public Work Material
Post-Bid
Dartmouth, MA

Rehabilitation of the East Filter Bed at the Wading RiverTreatment Facility
Results
Mansfield, MA 02048

Water Meters and Advanced Metering Infrastructure (AMI)
Post-Bid
Fairhaven, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Furnishing Ductile Iron Pipe, Hydrants, Hydrant Repair Kits/Parts, Gate Valves, Service Boxes, Corporations, Curb Stops, Gate Boxes, Polyethylene Tubing, Couplings, Hy Max Couplings, Transition Couplings, Repair Clamps, Service Saddles, Inserts and Thread Plugs
Post-Bid
Fall River, MA

Supply and Delivery of Miscellaneous Pipe Fittings
Term Contract
Results
Less than $17,000 est. value
North Attleborough, MA 02760

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Post-Bid
$920,000 est. value
Somerset, MA

Water Main Replacement Phase 19
Results
Less than $1,800,000 est. value
Fall River, MA 02722

Installation of Approximately 8,700 Linear Feet of Eight-Inch Diameter Cement Lined Ductile Iron Water Main
Post-Bid
$2,000,000 est. value
North Attleborough, MA

Last Updated 09/09/2020 10:53 AM
Project Title

King’s Highway 12-Inch Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) New Bedford, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,058,600
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project includes, but is not limited to, furnishing and installing 4-inch, 6-inch, 8-inch, and 12- inch cement lined ductile iron water main with polyethylene encasement, valves, fittings, hydrants, water services, connection into existing mains; furnishing, installing and removing temporary bypass piping (as required and approved by City and Engineer), abandoning existing water mains and hydrants; and furnishing and installing all appurtenances, incidentals and all other related and required work for successful completion of the project from east of MA Route 140 bridge crossing to the intersection of Kings Highway and Tarkiln Hill Road on Kings Highway New Bedford, Massachusetts.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents