Similar Projects
Willow Creek Trail Replacement - R4387 - City of Iowa City
Infrastructure
Conception
Less than $418,000 est. value
Iowa City, IA 52246

Court Street Reconstruction - S3946 - City of Iowa City
Infrastructure
Conception
$5,600,000 est. value
Iowa City, IA 52240

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

RFQ Construction Manager at Risk - UIHC - John Pappajohn Pavilion - L7-10 - Vertical Expansion of Inpatient Tower
Addition, Demolition, Renovation, Infrastructure - 90,000 SF
Bidding
$50,400,000 CJ est. value
Iowa City, IA 52242

PCC Pavement - Grade and New
Infrastructure
Bidding
$30,000,000 CJ est. value
Coralville, IA 52241

Costco Wholesale #1111 - Mezzanine Breakroom Addition / Coralville
Addition, Demolition, Infrastructure - 1,660 SF
Sub-Bidding
$450,000 CJ est. value
Coralville, IA 52241

Johnson County Historic Poor Farm Site Development
Infrastructure
Post-Bid
Iowa City, IA

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Post-Bid
$190,000 est. value
Oxford, IA

Melrose Avenue / IWV Road - Highway 218 to Hebl Avenue Improvement
Infrastructure
Results
$5,100,000 est. value
Iowa City, IA 52240

2021 Water Pavement Patching
Infrastructure
Results
$132,000 est. value
Iowa City, IA

Recreation Center ADA Improvements - R4351 - City of Iowa
Renovation, Infrastructure
Conception
$775,000 CJ est. value
Iowa City, IA 52240

Dubuque Street Reconstruction - S3939 - City of Iowa City
Infrastructure
Design
$2,100,000 est. value
Iowa City, IA 52240

RFP/Q Construction Manager at Risk - West Campus Parking Ramp - Construct Facility
New Construction, Infrastructure
Bidding
$39,000,000 CJ est. value
Iowa City, IA 52246

Muddy Creek Lane Patching and Subdrain
Infrastructure
Results
$143,810 est. value
Coralville, IA

Last Updated 09/12/2022 11:20 AM
Project Title

Bridge Replacement on Half Moon Avenue Southwest over Deer Creek

Physical Address View project details and contacts
City, State (County) Oxford, IA 52322   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge replacement on Half Moon Avenue SW over Deer Creek. A 30'-0" long by 3O'-6" wide single span continuous concrete slab bridge shall replace the existing 26' long by 20' wide steel stringer bridge with a concrete deck and abutments. Section 5, T79N, R7W, Johnson County, Iowa. A Certified check, made payable to the County, or a Cashier's check, made payable to either the County or to the Contractor, drawn upon a solvent bank or a bid bond, shall be filed with each proposal. Cashier's check, made payable to the Contractor, shall contain an unqualified endorsement to the County signed by the Contractor or his/her authorized agent. Failure to execute a contract and file an acceptable bond and certificate of insurance within 21 days of the date of the approval for awarding of the contract, as herein provided, will be just and sufficient cause for the denial of the award and the forfeiture of the proposal guarantee.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents